Cargando…
LHC cryogenics – Run2 (2015) summary and perspectives
After LS1 the LHC cryogenic installation was progressively restarted from May 2014. Cool down, multiple tests and qualifications of the machine components lasts for 10 months. The LHC cryogenic system with new validated scenario came back to operation for period of Run2 on 5 th April 2015. Run2 (201...
Autores principales: | Brodzinski, K, Claudet, S, Delikaris, D, Delprat, L, Ferlin, G, Rogez, E, Tavian, L |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2294510 |
Ejemplares similares
-
LHC cryogenics – new experience of run with increased beam energy and intensity
por: Brodzinski, K, et al.
Publicado: (2017) -
LHC Cryogenics - Strategy, unavailability root causes and limitations (RUN 2016)
por: Brodzinski, K, et al.
Publicado: (2017) -
LHC cryogenics - perspectives for RUN2 operation
por: Brodzinski, K, et al.
Publicado: (2014) -
The LHC Cryogenic Operation Availability Results from the First Physics Run of Three Years
por: Delikaris, D, et al.
Publicado: (2013) -
Main improvements of LHC Cryogenics Operation during Run 2 (2015-2018)
por: Delprat, L, et al.
Publicado: (2017)