Cargando…

Performance limitations from electron cloud in 2015

The brief experience with 25 ns beams in the LHC at the end of Run 1 suggested that the electron cloud effects were set to pose important challenges to the machine operation during Run 2. In spite of four weeks of dedicated scrubbing run, the 2015 proton run of the LHC fully confirmed this expectati...

Descripción completa

Detalles Bibliográficos
Autores principales: Iadarola, G, Bartosik, H, Li, K, Mether, L, Romano, A, Rumolo, G, Schenk, M
Lenguaje:eng
Publicado: CERN 2016
Materias:
Acceso en línea:http://cds.cern.ch/record/2294523
_version_ 1780956655492530176
author Iadarola, G
Bartosik, H
Li, K
Mether, L
Romano, A
Rumolo, G
Schenk, M
author_facet Iadarola, G
Bartosik, H
Li, K
Mether, L
Romano, A
Rumolo, G
Schenk, M
author_sort Iadarola, G
collection CERN
description The brief experience with 25 ns beams in the LHC at the end of Run 1 suggested that the electron cloud effects were set to pose important challenges to the machine operation during Run 2. In spite of four weeks of dedicated scrubbing run, the 2015 proton run of the LHC fully confirmed this expectation, with the electron cloud severely degrading the beam quality at the beginning of the scrubbing run and then limiting the number of bunches at 6.5 TeV, due to strong heat load in the cold regions. This contribution describes the main e-cloud observations and limitations encountered during the 2015 run. The dedicated scrubbing periods at 450 GeV, the intensity ramp-up with 25 ns beams at 6.5 TeV and tests with special beam variants (doublets, 8b+4e) are covered. Finally, based on the acquired experience and the lesson learned in 2015, a proposal for the scrubbing strategy and 25 ns intensity ramp-up in 2016 is presented.
id oai-inspirehep.net-1637710
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2016
publisher CERN
record_format invenio
spelling oai-inspirehep.net-16377102019-09-30T06:29:59Zhttp://cds.cern.ch/record/2294523engIadarola, GBartosik, HLi, KMether, LRomano, ARumolo, GSchenk, MPerformance limitations from electron cloud in 2015Accelerators and Storage RingsThe brief experience with 25 ns beams in the LHC at the end of Run 1 suggested that the electron cloud effects were set to pose important challenges to the machine operation during Run 2. In spite of four weeks of dedicated scrubbing run, the 2015 proton run of the LHC fully confirmed this expectation, with the electron cloud severely degrading the beam quality at the beginning of the scrubbing run and then limiting the number of bunches at 6.5 TeV, due to strong heat load in the cold regions. This contribution describes the main e-cloud observations and limitations encountered during the 2015 run. The dedicated scrubbing periods at 450 GeV, the intensity ramp-up with 25 ns beams at 6.5 TeV and tests with special beam variants (doublets, 8b+4e) are covered. Finally, based on the acquired experience and the lesson learned in 2015, a proposal for the scrubbing strategy and 25 ns intensity ramp-up in 2016 is presented.CERNoai:inspirehep.net:16377102016
spellingShingle Accelerators and Storage Rings
Iadarola, G
Bartosik, H
Li, K
Mether, L
Romano, A
Rumolo, G
Schenk, M
Performance limitations from electron cloud in 2015
title Performance limitations from electron cloud in 2015
title_full Performance limitations from electron cloud in 2015
title_fullStr Performance limitations from electron cloud in 2015
title_full_unstemmed Performance limitations from electron cloud in 2015
title_short Performance limitations from electron cloud in 2015
title_sort performance limitations from electron cloud in 2015
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2294523
work_keys_str_mv AT iadarolag performancelimitationsfromelectroncloudin2015
AT bartosikh performancelimitationsfromelectroncloudin2015
AT lik performancelimitationsfromelectroncloudin2015
AT metherl performancelimitationsfromelectroncloudin2015
AT romanoa performancelimitationsfromelectroncloudin2015
AT rumolog performancelimitationsfromelectroncloudin2015
AT schenkm performancelimitationsfromelectroncloudin2015