Cargando…

Status of the beam profile measurements at the LHC

During LS1, the various instruments for beam profile measurement at the LHC were upgraded to cope with the beam energy increase. In this contribution, a review of the status of the synchrotron radiation monitors, the beam gas ionization monitors, the beam gas vertex detector and the wirescanners wil...

Descripción completa

Detalles Bibliográficos
Autores principales: Trad, G, Baud, G, Bravin, E, Dehning, B, Ferroluzzi, M, Goldblatt, A, Piselli, E, Roncarolo, F, Storey, J, Veyrat, Q
Lenguaje:eng
Publicado: CERN 2016
Materias:
Acceso en línea:http://cds.cern.ch/record/2294529
_version_ 1780956656778084352
author Trad, G
Baud, G
Bravin, E
Dehning, B
Ferroluzzi, M
Goldblatt, A
Piselli, E
Roncarolo, F
Storey, J
Veyrat, Q
author_facet Trad, G
Baud, G
Bravin, E
Dehning, B
Ferroluzzi, M
Goldblatt, A
Piselli, E
Roncarolo, F
Storey, J
Veyrat, Q
author_sort Trad, G
collection CERN
description During LS1, the various instruments for beam profile measurement at the LHC were upgraded to cope with the beam energy increase. In this contribution, a review of the status of the synchrotron radiation monitors, the beam gas ionization monitors, the beam gas vertex detector and the wirescanners will be presented alongside the assessment of the obtained performance. The new features implemented and the issues encountered during 2015's operation will be highlighted. Additionally, the interventions and improvements planned for the coming winter shutdown will be discussed.
id oai-inspirehep.net-1637718
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2016
publisher CERN
record_format invenio
spelling oai-inspirehep.net-16377182019-09-30T06:29:59Zhttp://cds.cern.ch/record/2294529engTrad, GBaud, GBravin, EDehning, BFerroluzzi, MGoldblatt, APiselli, ERoncarolo, FStorey, JVeyrat, QStatus of the beam profile measurements at the LHCAccelerators and Storage RingsDuring LS1, the various instruments for beam profile measurement at the LHC were upgraded to cope with the beam energy increase. In this contribution, a review of the status of the synchrotron radiation monitors, the beam gas ionization monitors, the beam gas vertex detector and the wirescanners will be presented alongside the assessment of the obtained performance. The new features implemented and the issues encountered during 2015's operation will be highlighted. Additionally, the interventions and improvements planned for the coming winter shutdown will be discussed.CERNoai:inspirehep.net:16377182016
spellingShingle Accelerators and Storage Rings
Trad, G
Baud, G
Bravin, E
Dehning, B
Ferroluzzi, M
Goldblatt, A
Piselli, E
Roncarolo, F
Storey, J
Veyrat, Q
Status of the beam profile measurements at the LHC
title Status of the beam profile measurements at the LHC
title_full Status of the beam profile measurements at the LHC
title_fullStr Status of the beam profile measurements at the LHC
title_full_unstemmed Status of the beam profile measurements at the LHC
title_short Status of the beam profile measurements at the LHC
title_sort status of the beam profile measurements at the lhc
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2294529
work_keys_str_mv AT tradg statusofthebeamprofilemeasurementsatthelhc
AT baudg statusofthebeamprofilemeasurementsatthelhc
AT bravine statusofthebeamprofilemeasurementsatthelhc
AT dehningb statusofthebeamprofilemeasurementsatthelhc
AT ferroluzzim statusofthebeamprofilemeasurementsatthelhc
AT goldblatta statusofthebeamprofilemeasurementsatthelhc
AT pisellie statusofthebeamprofilemeasurementsatthelhc
AT roncarolof statusofthebeamprofilemeasurementsatthelhc
AT storeyj statusofthebeamprofilemeasurementsatthelhc
AT veyratq statusofthebeamprofilemeasurementsatthelhc