Cargando…

Feedback on controls from 2015 operation

The talk will first look back at the Long Shutdown 1 (LS1) from hardware and software consolidation perspectives. The review of the operation of the controls system during 2015 (what worked well and not so well) will be presented as well as the preliminary conclusions of the LS1 controls review held...

Descripción completa

Detalles Bibliográficos
Autor principal: Gourber-Pace, Marine
Lenguaje:eng
Publicado: CERN 2016
Materias:
Acceso en línea:http://cds.cern.ch/record/2294531
Descripción
Sumario:The talk will first look back at the Long Shutdown 1 (LS1) from hardware and software consolidation perspectives. The review of the operation of the controls system during 2015 (what worked well and not so well) will be presented as well as the preliminary conclusions of the LS1 controls review held with Operation and Equipment groups early December 2015. Finally an outlook for the coming years and next EYETS and LS1 will be provided.