Cargando…
Have we been operating safely in 2015?
During LS1 most machine protection systems (MPS) have undergone significant changes. A full (re-) commissioning of the MPS has been performed before and respectively during beam commissioning in 2015, followed by a step-wise intensity ramp-up to reach nominal beam intensities. This contribution will...
Autores principales: | Wollmann, D, Schmidt, R, Uythoven, J, Wenninger, J, Zerlauth, M |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2294532 |
Ejemplares similares
-
Machine Protection at the LHC – Experience of Three Years Running and Outlook for Operation at Nominal Energy
por: Wollmann, D, et al.
Publicado: (2013) -
Machine Protection Systems Performance And Issues 2012
por: Wollmann, D, et al.
Publicado: (2012) -
Safe Disposal of the LHC Beam without Beam Dump - Method and Experimental Verification
por: Valette, Matthieu, et al.
Publicado: (2018) -
Commissioning of the Machine Protection Systems of the Large Hadron Collider Following its First Long Shutdown
por: Wollmann, Daniel, et al.
Publicado: (2016) -
Machine Protection with a 700 MJ Beam
por: Baer, T, et al.
Publicado: (2015)