LHC YETS recovery

16 days are allocated in March 2016 to prepare the machine for the beam. Around 7000 powering tests will have to be performed to re-commission the superconducting circuits. An extensive list of tests will have to be executed as well on the various systems affected by interventions during YETS. A pre...

Descripción completa

Detalles Bibliográficos
Autor principal: Pojer, M
Lenguaje:eng
Publicado: CERN 2016
Materias:
Acceso en línea:http://cds.cern.ch/record/2294536
_version_ 1780956658279645184
author Pojer, M
author_facet Pojer, M
author_sort Pojer, M
collection CERN
description 16 days are allocated in March 2016 to prepare the machine for the beam. Around 7000 powering tests will have to be performed to re-commission the superconducting circuits. An extensive list of tests will have to be executed as well on the various systems affected by interventions during YETS. A preliminary planning for these tests will be shown.
id oai-inspirehep.net-1637727
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2016
publisher CERN
record_format invenio
spelling oai-inspirehep.net-16377272019-09-30T06:29:59Zhttp://cds.cern.ch/record/2294536engPojer, MLHC YETS recoveryAccelerators and Storage Rings16 days are allocated in March 2016 to prepare the machine for the beam. Around 7000 powering tests will have to be performed to re-commission the superconducting circuits. An extensive list of tests will have to be executed as well on the various systems affected by interventions during YETS. A preliminary planning for these tests will be shown.CERNoai:inspirehep.net:16377272016
spellingShingle Accelerators and Storage Rings
Pojer, M
LHC YETS recovery
title LHC YETS recovery
title_full LHC YETS recovery
title_fullStr LHC YETS recovery
title_full_unstemmed LHC YETS recovery
title_short LHC YETS recovery
title_sort lhc yets recovery
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2294536
work_keys_str_mv AT pojerm lhcyetsrecovery