Initial commissioning to stable beams
The LHC will resume operations next year with four weeks of dedicated commissioning of the machine with beam. This period will include all the measurements that are needed by the different systems in order to re-establish stable beam conditions after the end-of-year shutdown. In addition, the perfor...
Autores principales: | , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2294153 |
_version_ | 1780956658489360384 |
---|---|
author | Salvachua, B Baudrenghien, P Bracco, C Bravin, E Hofle, W Iadarola, G Lamont, M Lefevre, T Redaelli, S Solfaroli, M Timko, H Tomas, R Wenninger, J Zerlauth, M |
author_facet | Salvachua, B Baudrenghien, P Bracco, C Bravin, E Hofle, W Iadarola, G Lamont, M Lefevre, T Redaelli, S Solfaroli, M Timko, H Tomas, R Wenninger, J Zerlauth, M |
author_sort | Salvachua, B |
collection | CERN |
description | The LHC will resume operations next year with four weeks of dedicated commissioning of the machine with beam. This period will include all the measurements that are needed by the different systems in order to re-establish stable beam conditions after the end-of-year shutdown. In addition, the performance of the machine will be pushed by decreasing the beta-star. A series of measurements (optics, aperture, collimator settings, orbit, etc.) are needed in order to prepare and validate this new configuration. Before ramping up high intensities a dedicated scrubbing at injection will be scheduled. The machine protection intensity ramp up strategy for next year will be defined. |
id | oai-inspirehep.net-1637728 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2016 |
publisher | CERN |
record_format | invenio |
spelling | oai-inspirehep.net-16377282019-09-30T06:29:59Zhttp://cds.cern.ch/record/2294153engSalvachua, BBaudrenghien, PBracco, CBravin, EHofle, WIadarola, GLamont, MLefevre, TRedaelli, SSolfaroli, MTimko, HTomas, RWenninger, JZerlauth, MInitial commissioning to stable beamsAccelerators and Storage RingsThe LHC will resume operations next year with four weeks of dedicated commissioning of the machine with beam. This period will include all the measurements that are needed by the different systems in order to re-establish stable beam conditions after the end-of-year shutdown. In addition, the performance of the machine will be pushed by decreasing the beta-star. A series of measurements (optics, aperture, collimator settings, orbit, etc.) are needed in order to prepare and validate this new configuration. Before ramping up high intensities a dedicated scrubbing at injection will be scheduled. The machine protection intensity ramp up strategy for next year will be defined.CERNoai:inspirehep.net:16377282016 |
spellingShingle | Accelerators and Storage Rings Salvachua, B Baudrenghien, P Bracco, C Bravin, E Hofle, W Iadarola, G Lamont, M Lefevre, T Redaelli, S Solfaroli, M Timko, H Tomas, R Wenninger, J Zerlauth, M Initial commissioning to stable beams |
title | Initial commissioning to stable beams |
title_full | Initial commissioning to stable beams |
title_fullStr | Initial commissioning to stable beams |
title_full_unstemmed | Initial commissioning to stable beams |
title_short | Initial commissioning to stable beams |
title_sort | initial commissioning to stable beams |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2294153 |
work_keys_str_mv | AT salvachuab initialcommissioningtostablebeams AT baudrenghienp initialcommissioningtostablebeams AT braccoc initialcommissioningtostablebeams AT bravine initialcommissioningtostablebeams AT hoflew initialcommissioningtostablebeams AT iadarolag initialcommissioningtostablebeams AT lamontm initialcommissioningtostablebeams AT lefevret initialcommissioningtostablebeams AT redaellis initialcommissioningtostablebeams AT solfarolim initialcommissioningtostablebeams AT timkoh initialcommissioningtostablebeams AT tomasr initialcommissioningtostablebeams AT wenningerj initialcommissioningtostablebeams AT zerlauthm initialcommissioningtostablebeams |