Cargando…
Initial commissioning to stable beams
The LHC will resume operations next year with four weeks of dedicated commissioning of the machine with beam. This period will include all the measurements that are needed by the different systems in order to re-establish stable beam conditions after the end-of-year shutdown. In addition, the perfor...
Autores principales: | Salvachua, B, Baudrenghien, P, Bracco, C, Bravin, E, Hofle, W, Iadarola, G, Lamont, M, Lefevre, T, Redaelli, S, Solfaroli, M, Timko, H, Tomas, R, Wenninger, J, Zerlauth, M |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2294153 |
Ejemplares similares
-
Strategy for First Two Months of LHC Beam Commissioning (Commissioning to First Stable Beams)
por: Redaelli, S, et al.
Publicado: (2015) -
Operational experience during initial beam commissioning of the LHC
por: Fuchsberger, K, et al.
Publicado: (2010) -
Strategy for the first two months of the LHC beam commissioning and key early measurements
por: Redaelli, S, et al.
Publicado: (2014) -
Machine Protection Strategy for LHC Commissioning and Outlook for Future Challenges
por: Salvachua, B, et al.
Publicado: (2015) -
Critical Beam Losses during Commissioning and Initial Operation of the LHC
por: Robert-Démolaize, G, et al.
Publicado: (2006)