Cargando…
A Low-Noise Charge Amplifier for the ELENA Trajectory, Orbit, and Intensity Measurement System
A low-noise head amplifier has been developed for the extra low energy antiproton ring beam trajectory, orbit, and intensity measurement system at CERN. This system is based on 24 double-electrode electrostatic beam position monitors installed around the ring. A head amplifier is placed close to eac...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TNS.2017.2740238 http://cds.cern.ch/record/2302114 |
Sumario: | A low-noise head amplifier has been developed for the extra low energy antiproton ring beam trajectory, orbit, and intensity measurement system at CERN. This system is based on 24 double-electrode electrostatic beam position monitors installed around the ring. A head amplifier is placed close to each beam position monitor to amplify the electrode signals and generate a difference and a sum signal. These signals are sent to the digital acquisition system, about 50 m away from the ring, where they are digitized and further processed. The beam position can be measured by dividing the difference signal by the sum signal while the sum signal gives information relative to the beam intensity. The head amplifier consists of two discrete charge preamplifiers with junction field effect transistor (JFET) inputs, a sum and a difference stage, and two cable drivers. Special attention has been paid to the amplifier printed circuit board design to minimize the parasitic capacitances and inductances at the charge amplifier stages to meet the gain and noise requirements. The measurements carried out on the head amplifier showed a gain of 40.5 and 46.5 dB for the sum and difference outputs with a bandwidth from 200 Hz to 75 MHz and an input voltage noise density lower than $400~\text {pV}/\surd \text{Hz}$ . Twenty head amplifiers have been already installed in the ring and they have been used to detect the first beam signals during the first commissioning stage in November 2016. |
---|