Performance of Linac-4 instrumentation during commissioning

Linac-4 is CERN’s new H⁻ Linac, which will replace the aging Linac-2 proton machine. Linac-4 is being built and commissioned in stages. While the machine is permanently equipped with the standard beam instrumentation necessary to ensure smooth operation, three dedicated measurement benches have also...

Descripción completa

Detalles Bibliográficos
Autor principal: Raich, Uli
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-HB2016-WEPM1X01
http://cds.cern.ch/record/2304638
_version_ 1780957546797858816
author Raich, Uli
author_facet Raich, Uli
author_sort Raich, Uli
collection CERN
description Linac-4 is CERN’s new H⁻ Linac, which will replace the aging Linac-2 proton machine. Linac-4 is being built and commissioned in stages. While the machine is permanently equipped with the standard beam instrumentation necessary to ensure smooth operation, three dedicated measurement benches have also been designed to commission the source and LEBT at 45 keV, the MEBT and its chopper at 3 MeV as well as the first DTL tank at 12 MeV and finally the full DTL at 50 MeV and CCDTL at 100 MeV. The beam after the PIMS structures at the Linac’s full energy of 160 MeV will be sent to a beam dump and commissioned with permanently installed instruments. Installation and commissioning of the machine up to the CCDTL is now complete. This contribution will present the results from the various commissioning stages, showing the performance of the various diagnostic devices used and comparing the data obtained to simulations.
id oai-inspirehep.net-1638782
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2016
record_format invenio
spelling oai-inspirehep.net-16387822019-09-30T06:29:59Zdoi:10.18429/JACoW-HB2016-WEPM1X01http://cds.cern.ch/record/2304638engRaich, UliPerformance of Linac-4 instrumentation during commissioningAccelerators and Storage RingsLinac-4 is CERN’s new H⁻ Linac, which will replace the aging Linac-2 proton machine. Linac-4 is being built and commissioned in stages. While the machine is permanently equipped with the standard beam instrumentation necessary to ensure smooth operation, three dedicated measurement benches have also been designed to commission the source and LEBT at 45 keV, the MEBT and its chopper at 3 MeV as well as the first DTL tank at 12 MeV and finally the full DTL at 50 MeV and CCDTL at 100 MeV. The beam after the PIMS structures at the Linac’s full energy of 160 MeV will be sent to a beam dump and commissioned with permanently installed instruments. Installation and commissioning of the machine up to the CCDTL is now complete. This contribution will present the results from the various commissioning stages, showing the performance of the various diagnostic devices used and comparing the data obtained to simulations.oai:inspirehep.net:16387822016
spellingShingle Accelerators and Storage Rings
Raich, Uli
Performance of Linac-4 instrumentation during commissioning
title Performance of Linac-4 instrumentation during commissioning
title_full Performance of Linac-4 instrumentation during commissioning
title_fullStr Performance of Linac-4 instrumentation during commissioning
title_full_unstemmed Performance of Linac-4 instrumentation during commissioning
title_short Performance of Linac-4 instrumentation during commissioning
title_sort performance of linac-4 instrumentation during commissioning
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-HB2016-WEPM1X01
http://cds.cern.ch/record/2304638
work_keys_str_mv AT raichuli performanceoflinac4instrumentationduringcommissioning