Cargando…
LHC beam dumping system: status and readiness for LHC Run 2
The hardware status of the LHC Beam Dumping System (LBDS) after the many announced system improvements performed during Long Shutdown 1 (LS1) will be presented. The latest estimates of expected availability and reliability of the LBDS after LS1 will be summarized. The readiness of LBDS for LHC start...
Autores principales: | Magnin, N, Atanasov, M G, Borburgh, J, Boucly, C, Carlier, E, Gabourin, S, Goddard, B, Senaj, V, Uythoven, J, Voumard, N, Weterings, W |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2295099 |
Ejemplares similares
-
Changes to the LHC Beam Dumping System for LHC Run 2
por: Uythoven, Jan, et al.
Publicado: (2015) -
LHC beam dumping system
por: Carlier, E, et al.
Publicado: (2017) -
Commissioning of the Control System for the LHC Beam Dump Kicker System
por: Carlier, E, et al.
Publicado: (2010) -
Results from the LHC Beam Dump Reliability Run
por: Uythoven, J, et al.
Publicado: (2008) -
First Operational Experience with the LHC Beam Dump Trigger Synchronisation Unit
por: Antoine, A, et al.
Publicado: (2011)