Software packages: Status and commissioning plans

The many modifications of the software packages that have been done during LS1 will be reported. Based on the issues and requirements that have been presented in the 2012 Evian workshop [1], the solutions implemented and their impact on operation will be explained, the status of these different upgr...

Descripción completa

Detalles Bibliográficos
Autores principales: Jacquet, D, Baggiolini, V, Bau, J C, Buttner, M, Deghaye, S, Kruk, G, Roderick, C, Sigerud, K, Sliwinski, W, Wenninger, J, Wozniak, J, Zerlauth, M
Lenguaje:eng
Publicado: CERN 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/2295100
Descripción
Sumario:The many modifications of the software packages that have been done during LS1 will be reported. Based on the issues and requirements that have been presented in the 2012 Evian workshop [1], the solutions implemented and their impact on operation will be explained, the status of these different upgrade projects will be presented. Without doing a complete inventory of the control room applications, those with important functional modifications or presenting issues will be covered.