Status of the tune and orbit measurements and corrections and testing strategy
An upgrade of LHC beam instrumentation has been performed during the Long Shutdown 1. In this context both the beam position and tune monitoring systems, as well as their respective feedback systems have been reviewed and modified. This contribution presents an overview of the major hardware and sof...
Autores principales: | , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2295104 |
Sumario: | An upgrade of LHC beam instrumentation has been performed during the Long
Shutdown 1. In this context both the beam position and tune monitoring systems,
as well as their respective feedback systems have been reviewed and modified.
This contribution presents an overview of the major hardware and software
modifications performed during LS1 and the expected performance with 6.5TeV
beams in 2015. |
---|