Cargando…
Status of the tune and orbit measurements and corrections and testing strategy
An upgrade of LHC beam instrumentation has been performed during the Long Shutdown 1. In this context both the beam position and tune monitoring systems, as well as their respective feedback systems have been reviewed and modified. This contribution presents an overview of the major hardware and sof...
Autores principales: | , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2295104 |
_version_ | 1780956727153262592 |
---|---|
author | Andersen, M Baud, G Betz, M Boccard, C Boccardi, A Calvo, E Fullerton, J Gasior, M Jackson, S Jensen, L Jones, R Lefevre, T Olexa, J Savioz, J J Steinhagen, R Wendt, M Wenninger, J |
author_facet | Andersen, M Baud, G Betz, M Boccard, C Boccardi, A Calvo, E Fullerton, J Gasior, M Jackson, S Jensen, L Jones, R Lefevre, T Olexa, J Savioz, J J Steinhagen, R Wendt, M Wenninger, J |
author_sort | Andersen, M |
collection | CERN |
description | An upgrade of LHC beam instrumentation has been performed during the Long
Shutdown 1. In this context both the beam position and tune monitoring systems,
as well as their respective feedback systems have been reviewed and modified.
This contribution presents an overview of the major hardware and software
modifications performed during LS1 and the expected performance with 6.5TeV
beams in 2015. |
id | oai-inspirehep.net-1639525 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2014 |
publisher | CERN |
record_format | invenio |
spelling | oai-inspirehep.net-16395252019-09-30T06:29:59Zhttp://cds.cern.ch/record/2295104engAndersen, MBaud, GBetz, MBoccard, CBoccardi, ACalvo, EFullerton, JGasior, MJackson, SJensen, LJones, RLefevre, TOlexa, JSavioz, J JSteinhagen, RWendt, MWenninger, JStatus of the tune and orbit measurements and corrections and testing strategyAccelerators and Storage RingsAn upgrade of LHC beam instrumentation has been performed during the Long Shutdown 1. In this context both the beam position and tune monitoring systems, as well as their respective feedback systems have been reviewed and modified. This contribution presents an overview of the major hardware and software modifications performed during LS1 and the expected performance with 6.5TeV beams in 2015.CERNoai:inspirehep.net:16395252014 |
spellingShingle | Accelerators and Storage Rings Andersen, M Baud, G Betz, M Boccard, C Boccardi, A Calvo, E Fullerton, J Gasior, M Jackson, S Jensen, L Jones, R Lefevre, T Olexa, J Savioz, J J Steinhagen, R Wendt, M Wenninger, J Status of the tune and orbit measurements and corrections and testing strategy |
title | Status of the tune and orbit measurements and corrections and testing strategy |
title_full | Status of the tune and orbit measurements and corrections and testing strategy |
title_fullStr | Status of the tune and orbit measurements and corrections and testing strategy |
title_full_unstemmed | Status of the tune and orbit measurements and corrections and testing strategy |
title_short | Status of the tune and orbit measurements and corrections and testing strategy |
title_sort | status of the tune and orbit measurements and corrections and testing strategy |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2295104 |
work_keys_str_mv | AT andersenm statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy AT baudg statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy AT betzm statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy AT boccardc statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy AT boccardia statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy AT calvoe statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy AT fullertonj statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy AT gasiorm statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy AT jacksons statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy AT jensenl statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy AT jonesr statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy AT lefevret statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy AT olexaj statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy AT saviozjj statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy AT steinhagenr statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy AT wendtm statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy AT wenningerj statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy |