Cargando…

Status of the tune and orbit measurements and corrections and testing strategy

An upgrade of LHC beam instrumentation has been performed during the Long Shutdown 1. In this context both the beam position and tune monitoring systems, as well as their respective feedback systems have been reviewed and modified. This contribution presents an overview of the major hardware and sof...

Descripción completa

Detalles Bibliográficos
Autores principales: Andersen, M, Baud, G, Betz, M, Boccard, C, Boccardi, A, Calvo, E, Fullerton, J, Gasior, M, Jackson, S, Jensen, L, Jones, R, Lefevre, T, Olexa, J, Savioz, J J, Steinhagen, R, Wendt, M, Wenninger, J
Lenguaje:eng
Publicado: CERN 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/2295104
_version_ 1780956727153262592
author Andersen, M
Baud, G
Betz, M
Boccard, C
Boccardi, A
Calvo, E
Fullerton, J
Gasior, M
Jackson, S
Jensen, L
Jones, R
Lefevre, T
Olexa, J
Savioz, J J
Steinhagen, R
Wendt, M
Wenninger, J
author_facet Andersen, M
Baud, G
Betz, M
Boccard, C
Boccardi, A
Calvo, E
Fullerton, J
Gasior, M
Jackson, S
Jensen, L
Jones, R
Lefevre, T
Olexa, J
Savioz, J J
Steinhagen, R
Wendt, M
Wenninger, J
author_sort Andersen, M
collection CERN
description An upgrade of LHC beam instrumentation has been performed during the Long Shutdown 1. In this context both the beam position and tune monitoring systems, as well as their respective feedback systems have been reviewed and modified. This contribution presents an overview of the major hardware and software modifications performed during LS1 and the expected performance with 6.5TeV beams in 2015.
id oai-inspirehep.net-1639525
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
publisher CERN
record_format invenio
spelling oai-inspirehep.net-16395252019-09-30T06:29:59Zhttp://cds.cern.ch/record/2295104engAndersen, MBaud, GBetz, MBoccard, CBoccardi, ACalvo, EFullerton, JGasior, MJackson, SJensen, LJones, RLefevre, TOlexa, JSavioz, J JSteinhagen, RWendt, MWenninger, JStatus of the tune and orbit measurements and corrections and testing strategyAccelerators and Storage RingsAn upgrade of LHC beam instrumentation has been performed during the Long Shutdown 1. In this context both the beam position and tune monitoring systems, as well as their respective feedback systems have been reviewed and modified. This contribution presents an overview of the major hardware and software modifications performed during LS1 and the expected performance with 6.5TeV beams in 2015.CERNoai:inspirehep.net:16395252014
spellingShingle Accelerators and Storage Rings
Andersen, M
Baud, G
Betz, M
Boccard, C
Boccardi, A
Calvo, E
Fullerton, J
Gasior, M
Jackson, S
Jensen, L
Jones, R
Lefevre, T
Olexa, J
Savioz, J J
Steinhagen, R
Wendt, M
Wenninger, J
Status of the tune and orbit measurements and corrections and testing strategy
title Status of the tune and orbit measurements and corrections and testing strategy
title_full Status of the tune and orbit measurements and corrections and testing strategy
title_fullStr Status of the tune and orbit measurements and corrections and testing strategy
title_full_unstemmed Status of the tune and orbit measurements and corrections and testing strategy
title_short Status of the tune and orbit measurements and corrections and testing strategy
title_sort status of the tune and orbit measurements and corrections and testing strategy
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2295104
work_keys_str_mv AT andersenm statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy
AT baudg statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy
AT betzm statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy
AT boccardc statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy
AT boccardia statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy
AT calvoe statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy
AT fullertonj statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy
AT gasiorm statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy
AT jacksons statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy
AT jensenl statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy
AT jonesr statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy
AT lefevret statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy
AT olexaj statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy
AT saviozjj statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy
AT steinhagenr statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy
AT wendtm statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy
AT wenningerj statusofthetuneandorbitmeasurementsandcorrectionsandtestingstrategy