Cargando…

Machine protection background

The LHC Machine Protection System needs to adapt to the Run 2 operational requirements. In addition, important upgrades and consolidations have been implemented on the MPS backbone during the first long shutdown. This paper summarizes the changes affecting Beam Interlock System (BIS), Powering Inter...

Descripción completa

Detalles Bibliográficos
Autor principal: Romera Ramirez, I
Lenguaje:eng
Publicado: CERN 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/2295711
Descripción
Sumario:The LHC Machine Protection System needs to adapt to the Run 2 operational requirements. In addition, important upgrades and consolidations have been implemented on the MPS backbone during the first long shutdown. This paper summarizes the changes affecting Beam Interlock System (BIS), Powering Interlock System (PIC), Fast Magnet Current Change Monitors (FMCM), Quench Protection System (QPS) and Software Interlock System (SIS).