Cargando…
Machine protection background
The LHC Machine Protection System needs to adapt to the Run 2 operational requirements. In addition, important upgrades and consolidations have been implemented on the MPS backbone during the first long shutdown. This paper summarizes the changes affecting Beam Interlock System (BIS), Powering Inter...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2295711 |
Sumario: | The LHC Machine Protection System needs to adapt to the Run 2 operational requirements. In addition, important upgrades and consolidations have been implemented on the MPS backbone during the first long shutdown. This paper summarizes the changes affecting Beam Interlock System (BIS), Powering Interlock System (PIC), Fast Magnet Current Change Monitors (FMCM), Quench Protection System (QPS) and Software Interlock System (SIS). |
---|