Cargando…
BLMs and thresholds at 6.5/7 TeV
During Long Shutdown 1 the Beam Loss Monitoring system went through several hardware upgrades and general maintenance. Many elements of the system, starting from the tunnel detectors to the threshold-comparator cards were brought from their locations to the lab and refurbished. Almost 30% of the det...
Autores principales: | , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2295106 |