Cargando…
Commissioning and operation of the machine protection system
The presentation is reviewing the MPS commissioning strategy we used during Run1 for the initial setup of the machine and the intensity ramp-up. Based on operational experience, new strategy for the Set-Up Beam Flag definition is proposed to cope with the new beam parameters for Run2.
Autores principales: | Ponce, L, Chetvertkova, V, Salvachua, B, Valentino, G, Wenninger, J, Wollmann, D, Zerlauth, M |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2295108 |
Ejemplares similares
-
Machine Protection Strategy for LHC Commissioning and Outlook for Future Challenges
por: Salvachua, B, et al.
Publicado: (2015) -
Commissioning of the Machine Protection Systems of the Large Hadron Collider Following its First Long Shutdown
por: Wollmann, Daniel, et al.
Publicado: (2016) -
Machine Protection Systems Performance And Issues 2012
por: Wollmann, D, et al.
Publicado: (2012) -
Machine Protection at the LHC – Experience of Three Years Running and Outlook for Operation at Nominal Energy
por: Wollmann, D, et al.
Publicado: (2013) -
Machine Protection Challenges for HL-LHC
por: Schmidt, R, et al.
Publicado: (2014)