Cargando…
Powering tests
During the first, planned LHC Long Shutdown (LS1), several interventions have been carried out on the machine technical systems, besides the superconducting circuit consolidation, with the goal of increasing the system performance and availability, while raising the energy to its design value. In pa...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2295111 |
_version_ | 1780956728901238784 |
---|---|
author | Solfaroli Camillocci, M |
author_facet | Solfaroli Camillocci, M |
author_sort | Solfaroli Camillocci, M |
collection | CERN |
description | During the first, planned LHC Long Shutdown (LS1), several interventions have been carried out on the machine technical systems, besides the superconducting circuit consolidation, with the goal of increasing the system performance and availability, while raising the energy to its design value. In particular the cryogenic system, the power converters and the quench protection system undertook a series of modifications that have to be tested and might impact beam operation. These modifications are presented together with the plan and status of the system re-commissioning and the readiness of the superconducting circuit powering tests. |
id | oai-inspirehep.net-1639533 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2014 |
publisher | CERN |
record_format | invenio |
spelling | oai-inspirehep.net-16395332019-09-30T06:29:59Zhttp://cds.cern.ch/record/2295111engSolfaroli Camillocci, MPowering testsAccelerators and Storage RingsDuring the first, planned LHC Long Shutdown (LS1), several interventions have been carried out on the machine technical systems, besides the superconducting circuit consolidation, with the goal of increasing the system performance and availability, while raising the energy to its design value. In particular the cryogenic system, the power converters and the quench protection system undertook a series of modifications that have to be tested and might impact beam operation. These modifications are presented together with the plan and status of the system re-commissioning and the readiness of the superconducting circuit powering tests.CERNoai:inspirehep.net:16395332014 |
spellingShingle | Accelerators and Storage Rings Solfaroli Camillocci, M Powering tests |
title | Powering tests |
title_full | Powering tests |
title_fullStr | Powering tests |
title_full_unstemmed | Powering tests |
title_short | Powering tests |
title_sort | powering tests |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2295111 |
work_keys_str_mv | AT solfarolicamilloccim poweringtests |