Cargando…

Powering tests

During the first, planned LHC Long Shutdown (LS1), several interventions have been carried out on the machine technical systems, besides the superconducting circuit consolidation, with the goal of increasing the system performance and availability, while raising the energy to its design value. In pa...

Descripción completa

Detalles Bibliográficos
Autor principal: Solfaroli Camillocci, M
Lenguaje:eng
Publicado: CERN 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/2295111
_version_ 1780956728901238784
author Solfaroli Camillocci, M
author_facet Solfaroli Camillocci, M
author_sort Solfaroli Camillocci, M
collection CERN
description During the first, planned LHC Long Shutdown (LS1), several interventions have been carried out on the machine technical systems, besides the superconducting circuit consolidation, with the goal of increasing the system performance and availability, while raising the energy to its design value. In particular the cryogenic system, the power converters and the quench protection system undertook a series of modifications that have to be tested and might impact beam operation. These modifications are presented together with the plan and status of the system re-commissioning and the readiness of the superconducting circuit powering tests.
id oai-inspirehep.net-1639533
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
publisher CERN
record_format invenio
spelling oai-inspirehep.net-16395332019-09-30T06:29:59Zhttp://cds.cern.ch/record/2295111engSolfaroli Camillocci, MPowering testsAccelerators and Storage RingsDuring the first, planned LHC Long Shutdown (LS1), several interventions have been carried out on the machine technical systems, besides the superconducting circuit consolidation, with the goal of increasing the system performance and availability, while raising the energy to its design value. In particular the cryogenic system, the power converters and the quench protection system undertook a series of modifications that have to be tested and might impact beam operation. These modifications are presented together with the plan and status of the system re-commissioning and the readiness of the superconducting circuit powering tests.CERNoai:inspirehep.net:16395332014
spellingShingle Accelerators and Storage Rings
Solfaroli Camillocci, M
Powering tests
title Powering tests
title_full Powering tests
title_fullStr Powering tests
title_full_unstemmed Powering tests
title_short Powering tests
title_sort powering tests
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2295111
work_keys_str_mv AT solfarolicamilloccim poweringtests