Cargando…

The SPS 200 MHz TWC impedance after the LIU upgrade

As a part of the LHC Injectors Upgrade project (LIU) the 200 MHz Travelling Wave Cavities (TWC) of the Super Proton Synchrotron (SPS) will be upgraded. The two existing five-section cavities will be rearranged into four three-section cavities (using two existing spare sections), thereby increasing t...

Descripción completa

Detalles Bibliográficos
Autores principales: Roggen, Toon, Calaga, Rama, Caspers, Fritz, Kaltenbacher, Thomas, Vollinger, Christine
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-HB2016-MOPR011
http://cds.cern.ch/record/2304641
_version_ 1780957547446927360
author Roggen, Toon
Calaga, Rama
Caspers, Fritz
Kaltenbacher, Thomas
Vollinger, Christine
author_facet Roggen, Toon
Calaga, Rama
Caspers, Fritz
Kaltenbacher, Thomas
Vollinger, Christine
author_sort Roggen, Toon
collection CERN
description As a part of the LHC Injectors Upgrade project (LIU) the 200 MHz Travelling Wave Cavities (TWC) of the Super Proton Synchrotron (SPS) will be upgraded. The two existing five-section cavities will be rearranged into four three-section cavities (using two existing spare sections), thereby increasing the total voltage from 7 MV (I$_{RF}$ = 1.5 A) to 10 MV (I$_{RF}$ = 3.0 A). Projections of the HL-LHC (High Luminosity Large Hadron Collider) era are conceived by the macro-particle simulation code BLonD, that makes use of an impedance model of the SPS, developed from a thorough survey of machine elements. This paper analyses the impedance contribution of the 200 MHz cavities in the two configurations, using electromagnetic simulations. Measurements of the existing cavities in the SPS and a single-section prototype are also presented.
id oai-inspirehep.net-1639596
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2016
record_format invenio
spelling oai-inspirehep.net-16395962019-09-30T06:29:59Zdoi:10.18429/JACoW-HB2016-MOPR011http://cds.cern.ch/record/2304641engRoggen, ToonCalaga, RamaCaspers, FritzKaltenbacher, ThomasVollinger, ChristineThe SPS 200 MHz TWC impedance after the LIU upgradeAccelerators and Storage RingsAs a part of the LHC Injectors Upgrade project (LIU) the 200 MHz Travelling Wave Cavities (TWC) of the Super Proton Synchrotron (SPS) will be upgraded. The two existing five-section cavities will be rearranged into four three-section cavities (using two existing spare sections), thereby increasing the total voltage from 7 MV (I$_{RF}$ = 1.5 A) to 10 MV (I$_{RF}$ = 3.0 A). Projections of the HL-LHC (High Luminosity Large Hadron Collider) era are conceived by the macro-particle simulation code BLonD, that makes use of an impedance model of the SPS, developed from a thorough survey of machine elements. This paper analyses the impedance contribution of the 200 MHz cavities in the two configurations, using electromagnetic simulations. Measurements of the existing cavities in the SPS and a single-section prototype are also presented.oai:inspirehep.net:16395962016
spellingShingle Accelerators and Storage Rings
Roggen, Toon
Calaga, Rama
Caspers, Fritz
Kaltenbacher, Thomas
Vollinger, Christine
The SPS 200 MHz TWC impedance after the LIU upgrade
title The SPS 200 MHz TWC impedance after the LIU upgrade
title_full The SPS 200 MHz TWC impedance after the LIU upgrade
title_fullStr The SPS 200 MHz TWC impedance after the LIU upgrade
title_full_unstemmed The SPS 200 MHz TWC impedance after the LIU upgrade
title_short The SPS 200 MHz TWC impedance after the LIU upgrade
title_sort sps 200 mhz twc impedance after the liu upgrade
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-HB2016-MOPR011
http://cds.cern.ch/record/2304641
work_keys_str_mv AT roggentoon thesps200mhztwcimpedanceaftertheliuupgrade
AT calagarama thesps200mhztwcimpedanceaftertheliuupgrade
AT caspersfritz thesps200mhztwcimpedanceaftertheliuupgrade
AT kaltenbacherthomas thesps200mhztwcimpedanceaftertheliuupgrade
AT vollingerchristine thesps200mhztwcimpedanceaftertheliuupgrade
AT roggentoon sps200mhztwcimpedanceaftertheliuupgrade
AT calagarama sps200mhztwcimpedanceaftertheliuupgrade
AT caspersfritz sps200mhztwcimpedanceaftertheliuupgrade
AT kaltenbacherthomas sps200mhztwcimpedanceaftertheliuupgrade
AT vollingerchristine sps200mhztwcimpedanceaftertheliuupgrade