Cargando…
The SPS 200 MHz TWC impedance after the LIU upgrade
As a part of the LHC Injectors Upgrade project (LIU) the 200 MHz Travelling Wave Cavities (TWC) of the Super Proton Synchrotron (SPS) will be upgraded. The two existing five-section cavities will be rearranged into four three-section cavities (using two existing spare sections), thereby increasing t...
Autores principales: | , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-HB2016-MOPR011 http://cds.cern.ch/record/2304641 |
_version_ | 1780957547446927360 |
---|---|
author | Roggen, Toon Calaga, Rama Caspers, Fritz Kaltenbacher, Thomas Vollinger, Christine |
author_facet | Roggen, Toon Calaga, Rama Caspers, Fritz Kaltenbacher, Thomas Vollinger, Christine |
author_sort | Roggen, Toon |
collection | CERN |
description | As a part of the LHC Injectors Upgrade project (LIU) the 200 MHz Travelling Wave Cavities (TWC) of the Super Proton Synchrotron (SPS) will be upgraded. The two existing five-section cavities will be rearranged into four three-section cavities (using two existing spare sections), thereby increasing the total voltage from 7 MV (I$_{RF}$ = 1.5 A) to 10 MV (I$_{RF}$ = 3.0 A). Projections of the HL-LHC (High Luminosity Large Hadron Collider) era are conceived by the macro-particle simulation code BLonD, that makes use of an impedance model of the SPS, developed from a thorough survey of machine elements. This paper analyses the impedance contribution of the 200 MHz cavities in the two configurations, using electromagnetic simulations. Measurements of the existing cavities in the SPS and a single-section prototype are also presented. |
id | oai-inspirehep.net-1639596 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2016 |
record_format | invenio |
spelling | oai-inspirehep.net-16395962019-09-30T06:29:59Zdoi:10.18429/JACoW-HB2016-MOPR011http://cds.cern.ch/record/2304641engRoggen, ToonCalaga, RamaCaspers, FritzKaltenbacher, ThomasVollinger, ChristineThe SPS 200 MHz TWC impedance after the LIU upgradeAccelerators and Storage RingsAs a part of the LHC Injectors Upgrade project (LIU) the 200 MHz Travelling Wave Cavities (TWC) of the Super Proton Synchrotron (SPS) will be upgraded. The two existing five-section cavities will be rearranged into four three-section cavities (using two existing spare sections), thereby increasing the total voltage from 7 MV (I$_{RF}$ = 1.5 A) to 10 MV (I$_{RF}$ = 3.0 A). Projections of the HL-LHC (High Luminosity Large Hadron Collider) era are conceived by the macro-particle simulation code BLonD, that makes use of an impedance model of the SPS, developed from a thorough survey of machine elements. This paper analyses the impedance contribution of the 200 MHz cavities in the two configurations, using electromagnetic simulations. Measurements of the existing cavities in the SPS and a single-section prototype are also presented.oai:inspirehep.net:16395962016 |
spellingShingle | Accelerators and Storage Rings Roggen, Toon Calaga, Rama Caspers, Fritz Kaltenbacher, Thomas Vollinger, Christine The SPS 200 MHz TWC impedance after the LIU upgrade |
title | The SPS 200 MHz TWC impedance after the LIU upgrade |
title_full | The SPS 200 MHz TWC impedance after the LIU upgrade |
title_fullStr | The SPS 200 MHz TWC impedance after the LIU upgrade |
title_full_unstemmed | The SPS 200 MHz TWC impedance after the LIU upgrade |
title_short | The SPS 200 MHz TWC impedance after the LIU upgrade |
title_sort | sps 200 mhz twc impedance after the liu upgrade |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-HB2016-MOPR011 http://cds.cern.ch/record/2304641 |
work_keys_str_mv | AT roggentoon thesps200mhztwcimpedanceaftertheliuupgrade AT calagarama thesps200mhztwcimpedanceaftertheliuupgrade AT caspersfritz thesps200mhztwcimpedanceaftertheliuupgrade AT kaltenbacherthomas thesps200mhztwcimpedanceaftertheliuupgrade AT vollingerchristine thesps200mhztwcimpedanceaftertheliuupgrade AT roggentoon sps200mhztwcimpedanceaftertheliuupgrade AT calagarama sps200mhztwcimpedanceaftertheliuupgrade AT caspersfritz sps200mhztwcimpedanceaftertheliuupgrade AT kaltenbacherthomas sps200mhztwcimpedanceaftertheliuupgrade AT vollingerchristine sps200mhztwcimpedanceaftertheliuupgrade |