Cargando…

Femto-second synchronisation with a waveguide interferometer

CERN’s compact linear collider CLIC requires crab cavities on opposing linacs to rotate bunches of particles into alignment at the interaction point (IP). These cavities are located approximately 25 metres either side of the IP. The luminosity target requires synchronisation of their RF phases to be...

Descripción completa

Detalles Bibliográficos
Autores principales: Dexter, A C, Smith, S J, Woolley, B J, Grudiev, A
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.1016/j.nima.2017.11.046
http://cds.cern.ch/record/2643830

Ejemplares similares