Cargando…
Machine development studies for PSB extraction at 160 MeV and PSB to PS beam transfer
This paper collects the machine development (MD) activities for the beam transfer studies in 2016 concerning the PSB extraction and the PSB-to-PS transfer. Many topics are covered: from the 160 MeV extraction from the PSB, useful for the future commissioning activities after the connection with Lina...
Autores principales: | Forte, V, Albright, S, Bartmann, W, Borburgh, J, Ferrero Colomo, A, Damerau, H, Di Giovanni, G P, Coralejo Feliciano, L M, Fraser, M A, Gamba, D, Mikulec, B, Guerrero Ollacarizqueta, A, Serluca, M, Sermeus, L, Sterbini, G |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.23727/CERN-Proceedings-2017-002.3 http://cds.cern.ch/record/2301795 |
Ejemplares similares
-
160 MeV $H^-$ Injection into the CERN PSB
por: Weterings, W, et al.
Publicado: (2007) -
Status of the 160 MeV H- Injection into the CERN PSB
por: Weterings, W, et al.
Publicado: (2012) -
Performance of the CERN PSB at 160 MeV with $H^{-}$ charge exchange injection
por: Forte, Vincenzo
Publicado: (2016) -
Stripping Foil Issues for H- Injection into the CERN PSB at 160 MeV
por: Goddard, B, et al.
Publicado: (2010) -
Performance validation of the upgraded PSB Transfer Kicker BT2.KFA20
por: Coralejo Feliciano, Luis Miguel, et al.
Publicado: (2020)