Cargando…
Injection septa position and angle optimisation in view of the 2 GeV liu upgrade of the CERN PS
In the framework of the LHC Injector Upgrade (LIU)project the CERN PS injection kinetic energy will be up-graded from 1.4 to 2 GeV. The injection equipment, whichis already operating close to its limit, is being redesigned tocope with 30% increase in the beam rigidity. In this paper wepresent the ex...
Autores principales: | Serluca, HM, Bartmann, W, Forte, V, Fraser, M, Sterbini, G |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.23727/CERN-Proceedings-2017-002.51 http://cds.cern.ch/record/2301801 |
Ejemplares similares
-
Performance of the PS Injection Kicker System Short Circuit Mode Upgrade for Operation with 2 GeV LIU Beams
por: Kramer, Thomas, et al.
Publicado: (2017) -
Feasibility Study of the PS Injection for 2 GeV LIU Beams with an Upgraded KFA-45 Injection Kicker System Operating in Short Circuit Mode
por: Kramer, Thomas, et al.
Publicado: (2016) -
Upgrades for the CERN PSB-to-PS Transfer at 2 GeV
por: Bartmann, W, et al.
Publicado: (2013) -
CERN PSB to PS Transfer Modifications for the 2 GeV Upgrade
por: Bartmann, W, et al.
Publicado: (2012) -
Design and Development of Separation Septa for the CERN PS Booster Upgrade
por: Hourican, M, et al.
Publicado: (2012)