Cargando…
Smooth B-train
The transmission of the208Pb82+Early Beam between thetime of Start Ramp up to transition of the LHCION cyclesin the SPS has been improved in 2016 by optimising thetransfer function of the Frequency Program Data used forthe generation of the Master DDS output.
Autores principales: | Bohl, T, Pashnin, A |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.23727/CERN-Proceedings-2017-002.155 http://cds.cern.ch/record/2301818 |
Ejemplares similares
-
B Train Interface
por: Bento, J, et al.
Publicado: (1998) -
Radial smoothing and closed orbit
por: Burnod, L, et al.
Publicado: (1983) -
B-train test
por: Kamber, I
Publicado: (1980) -
Cheburashka: A Tool for Consistent Memory Map Configuration Across Hardware and Software
por: Rey, A, et al.
Publicado: (2014) -
Smooth Ion Energy Tuning in Linear Accelerator
por: Shalnov, A V, et al.
Publicado: (1996)