The performance of the LHC injection and extraction systems and the main problems encountered during 2012 operation are described. Special attention is dedicated to the stability of the transfer lines, steering frequency, sensitivity to beam and machine changes, injection protection collimators setu...
Autores principales: | , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2302726 |
Sumario: | The performance of the LHC injection and extraction systems and the main
problems encountered during 2012 operation are described. Special attention is
dedicated to the stability of the transfer lines, steering frequency,
sensitivity to beam and machine changes, injection protection collimators setup
and the consequent impact on operation and possible machine protection issues.
The improvements foreseen for operation with injection of up to 288 bunches
after LS1 in terms of stability, availability and safety are explored. The
modifications foreseen to strengthen the reliability of the LHC Beam Dumping
System and the new TCDQ hardware for operation at 6.5 TeV with high intensity
beams are introduced. |
---|