" What can you get" – Controls software
The control system is ready for running the LHC at increased intensity at 6.5TeV and 25ns bunch spacing. Still, BE-CO will carry out a range of activities during LS1 for adding functionality and to further improve performance and availability of the controls system while meeting required security st...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2302728 |
Sumario: | The control system is ready for running the LHC at increased intensity at 6.5TeV
and 25ns bunch spacing. Still, BE-CO will carry out a range of activities during
LS1 for adding functionality and to further improve performance and availability
of the controls system while meeting required security standards. This paper
presents those BE-CO activities foreseen for LS1, which will have a direct or
indirect impact on LHC operation. |
---|