Cargando…
Review of the instabilities observed during the 2012 run and actions taken
Despite the excellent performance of the LHC in 2012, with a record peak luminosity at 4 TeV corresponding to 77% of the 7 TeV design luminosity of 10 34 cm-2 s-1 , the intensity ramp-up was perturbed by several types of instabilities. All the observations (during both physics cycles and dedicated M...
Autores principales: | , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2302426 |
_version_ | 1780957272977965056 |
---|---|
author | Métral, E Arduini, G Assmann, R Bruning, O Buffat, X Burov, A Herr, W Hofle, W Lamont, M Mounet, N Pieloni, T Rumolo, G Salvant, B Schmidt, R Shaposhnikova, E Valuch, D Wenninger, J White, S Zimmermann, F |
author_facet | Métral, E Arduini, G Assmann, R Bruning, O Buffat, X Burov, A Herr, W Hofle, W Lamont, M Mounet, N Pieloni, T Rumolo, G Salvant, B Schmidt, R Shaposhnikova, E Valuch, D Wenninger, J White, S Zimmermann, F |
author_sort | Métral, E |
collection | CERN |
description | Despite the excellent performance of the LHC in 2012, with a record peak
luminosity at 4 TeV corresponding to 77% of the 7 TeV design luminosity of 10 34
cm-2 s-1 , the intensity ramp-up was perturbed by several types of
instabilities. All the observations (during both physics cycles and dedicated
MDs) are critically reviewed, comparing them to past predictions and new
findings. The lessons learned and actions taken are then discussed in detail. |
id | oai-inspirehep.net-1650705 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2012 |
publisher | CERN |
record_format | invenio |
spelling | oai-inspirehep.net-16507052019-09-30T06:29:59Zhttp://cds.cern.ch/record/2302426engMétral, EArduini, GAssmann, RBruning, OBuffat, XBurov, AHerr, WHofle, WLamont, MMounet, NPieloni, TRumolo, GSalvant, BSchmidt, RShaposhnikova, EValuch, DWenninger, JWhite, SZimmermann, FReview of the instabilities observed during the 2012 run and actions takenAccelerators and Storage RingsDespite the excellent performance of the LHC in 2012, with a record peak luminosity at 4 TeV corresponding to 77% of the 7 TeV design luminosity of 10 34 cm-2 s-1 , the intensity ramp-up was perturbed by several types of instabilities. All the observations (during both physics cycles and dedicated MDs) are critically reviewed, comparing them to past predictions and new findings. The lessons learned and actions taken are then discussed in detail.CERNoai:inspirehep.net:16507052012 |
spellingShingle | Accelerators and Storage Rings Métral, E Arduini, G Assmann, R Bruning, O Buffat, X Burov, A Herr, W Hofle, W Lamont, M Mounet, N Pieloni, T Rumolo, G Salvant, B Schmidt, R Shaposhnikova, E Valuch, D Wenninger, J White, S Zimmermann, F Review of the instabilities observed during the 2012 run and actions taken |
title | Review of the instabilities observed during the 2012 run and actions taken |
title_full | Review of the instabilities observed during the 2012 run and actions taken |
title_fullStr | Review of the instabilities observed during the 2012 run and actions taken |
title_full_unstemmed | Review of the instabilities observed during the 2012 run and actions taken |
title_short | Review of the instabilities observed during the 2012 run and actions taken |
title_sort | review of the instabilities observed during the 2012 run and actions taken |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2302426 |
work_keys_str_mv | AT metrale reviewoftheinstabilitiesobservedduringthe2012runandactionstaken AT arduinig reviewoftheinstabilitiesobservedduringthe2012runandactionstaken AT assmannr reviewoftheinstabilitiesobservedduringthe2012runandactionstaken AT bruningo reviewoftheinstabilitiesobservedduringthe2012runandactionstaken AT buffatx reviewoftheinstabilitiesobservedduringthe2012runandactionstaken AT burova reviewoftheinstabilitiesobservedduringthe2012runandactionstaken AT herrw reviewoftheinstabilitiesobservedduringthe2012runandactionstaken AT hoflew reviewoftheinstabilitiesobservedduringthe2012runandactionstaken AT lamontm reviewoftheinstabilitiesobservedduringthe2012runandactionstaken AT mounetn reviewoftheinstabilitiesobservedduringthe2012runandactionstaken AT pielonit reviewoftheinstabilitiesobservedduringthe2012runandactionstaken AT rumolog reviewoftheinstabilitiesobservedduringthe2012runandactionstaken AT salvantb reviewoftheinstabilitiesobservedduringthe2012runandactionstaken AT schmidtr reviewoftheinstabilitiesobservedduringthe2012runandactionstaken AT shaposhnikovae reviewoftheinstabilitiesobservedduringthe2012runandactionstaken AT valuchd reviewoftheinstabilitiesobservedduringthe2012runandactionstaken AT wenningerj reviewoftheinstabilitiesobservedduringthe2012runandactionstaken AT whites reviewoftheinstabilitiesobservedduringthe2012runandactionstaken AT zimmermannf reviewoftheinstabilitiesobservedduringthe2012runandactionstaken |