Cargando…
LHC Vacuum System: 2012 Review and 2014 Outlook
During 2012 only a few beam dumps were attributed to vacuum sector valve closures and the vacuum surface and coating group was involved in only two urgent interventions that kept the beam off for less than two days each. In this paper the pressure threshold policy adopted since the beginning of the...
Autores principales: | Lanza, G, Baglin, V, Bregliozzi, G, Jimenez, J M |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2302432 |
Ejemplares similares
-
Vacuum performance and lessons for 2012
por: Baglin, V, et al.
Publicado: (2012) -
Synchrotron Radiation in the LHC Vacuum System
por: Baglin, V, et al.
Publicado: (2011) -
CERN Vacuum-System Activities during the Long Shutdown 1: The LHC Beam Vacuum
por: Baglin, V, et al.
Publicado: (2014) -
LHC vacuum system upgrade during long shutdown 1 and vacuum expectation for the 2015 operation restart
por: Bregliozzi, G, et al.
Publicado: (2014) -
LHC Beam Vacuum During 2011 Machine Operation
por: Lanza, G, et al.
Publicado: (2012)