Cargando…
LHC collimation cleaning and operation outlook
An overview of the collimation system performance during 2012 is described. The collimator " tight " settings for the 60 cm β reach are introduced and the evolution of the cleaning inefficiency achieved throughout the year with one single collimator alignment is presented. The performance...
Autores principales: | , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2302435 |
_version_ | 1780957274905247744 |
---|---|
author | Salvachua, B Assmann, R W Bruce, R Cauchi, M Deboy, D Lari, L Marsili, A Mirarchi, D Quaranta, E Redaelli, S Rossi, A Valentino, G |
author_facet | Salvachua, B Assmann, R W Bruce, R Cauchi, M Deboy, D Lari, L Marsili, A Mirarchi, D Quaranta, E Redaelli, S Rossi, A Valentino, G |
author_sort | Salvachua, B |
collection | CERN |
description | An overview of the collimation system performance during 2012 is described. The collimator " tight " settings for the 60 cm β reach are introduced and the evolution of the cleaning inefficiency achieved throughout the year with one single collimator alignment is presented. The performance of the semi-automatic collimator alignment tools is discussed. We investigate the beam losses through the cycle with emphasis on the yearly evolution of the measured instantaneous beam lifetime in critical phases of the operational cycle. The concept of collimators with integrated beam positions monitors (BPM) is presented here and their effect on the β reach after the long shutdown I is analyzed. The baseline settings strategy for the startup in 2015 is discussed based on the expected performance of the collima-tors with BPMs. New values of β reach are discussed. |
id | oai-inspirehep.net-1650714 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2012 |
publisher | CERN |
record_format | invenio |
spelling | oai-inspirehep.net-16507142019-09-30T06:29:59Zhttp://cds.cern.ch/record/2302435engSalvachua, BAssmann, R WBruce, RCauchi, MDeboy, DLari, LMarsili, AMirarchi, DQuaranta, ERedaelli, SRossi, AValentino, GLHC collimation cleaning and operation outlookAccelerators and Storage RingsAn overview of the collimation system performance during 2012 is described. The collimator " tight " settings for the 60 cm β reach are introduced and the evolution of the cleaning inefficiency achieved throughout the year with one single collimator alignment is presented. The performance of the semi-automatic collimator alignment tools is discussed. We investigate the beam losses through the cycle with emphasis on the yearly evolution of the measured instantaneous beam lifetime in critical phases of the operational cycle. The concept of collimators with integrated beam positions monitors (BPM) is presented here and their effect on the β reach after the long shutdown I is analyzed. The baseline settings strategy for the startup in 2015 is discussed based on the expected performance of the collima-tors with BPMs. New values of β reach are discussed.CERNoai:inspirehep.net:16507142012 |
spellingShingle | Accelerators and Storage Rings Salvachua, B Assmann, R W Bruce, R Cauchi, M Deboy, D Lari, L Marsili, A Mirarchi, D Quaranta, E Redaelli, S Rossi, A Valentino, G LHC collimation cleaning and operation outlook |
title | LHC collimation cleaning and operation outlook |
title_full | LHC collimation cleaning and operation outlook |
title_fullStr | LHC collimation cleaning and operation outlook |
title_full_unstemmed | LHC collimation cleaning and operation outlook |
title_short | LHC collimation cleaning and operation outlook |
title_sort | lhc collimation cleaning and operation outlook |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2302435 |
work_keys_str_mv | AT salvachuab lhccollimationcleaningandoperationoutlook AT assmannrw lhccollimationcleaningandoperationoutlook AT brucer lhccollimationcleaningandoperationoutlook AT cauchim lhccollimationcleaningandoperationoutlook AT deboyd lhccollimationcleaningandoperationoutlook AT laril lhccollimationcleaningandoperationoutlook AT marsilia lhccollimationcleaningandoperationoutlook AT mirarchid lhccollimationcleaningandoperationoutlook AT quarantae lhccollimationcleaningandoperationoutlook AT redaellis lhccollimationcleaningandoperationoutlook AT rossia lhccollimationcleaningandoperationoutlook AT valentinog lhccollimationcleaningandoperationoutlook |