Cargando…

LHC collimation cleaning and operation outlook

An overview of the collimation system performance during 2012 is described. The collimator " tight " settings for the 60 cm β reach are introduced and the evolution of the cleaning inefficiency achieved throughout the year with one single collimator alignment is presented. The performance...

Descripción completa

Detalles Bibliográficos
Autores principales: Salvachua, B, Assmann, R W, Bruce, R, Cauchi, M, Deboy, D, Lari, L, Marsili, A, Mirarchi, D, Quaranta, E, Redaelli, S, Rossi, A, Valentino, G
Lenguaje:eng
Publicado: CERN 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/2302435
_version_ 1780957274905247744
author Salvachua, B
Assmann, R W
Bruce, R
Cauchi, M
Deboy, D
Lari, L
Marsili, A
Mirarchi, D
Quaranta, E
Redaelli, S
Rossi, A
Valentino, G
author_facet Salvachua, B
Assmann, R W
Bruce, R
Cauchi, M
Deboy, D
Lari, L
Marsili, A
Mirarchi, D
Quaranta, E
Redaelli, S
Rossi, A
Valentino, G
author_sort Salvachua, B
collection CERN
description An overview of the collimation system performance during 2012 is described. The collimator " tight " settings for the 60 cm β reach are introduced and the evolution of the cleaning inefficiency achieved throughout the year with one single collimator alignment is presented. The performance of the semi-automatic collimator alignment tools is discussed. We investigate the beam losses through the cycle with emphasis on the yearly evolution of the measured instantaneous beam lifetime in critical phases of the operational cycle. The concept of collimators with integrated beam positions monitors (BPM) is presented here and their effect on the β reach after the long shutdown I is analyzed. The baseline settings strategy for the startup in 2015 is discussed based on the expected performance of the collima-tors with BPMs. New values of β reach are discussed.
id oai-inspirehep.net-1650714
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
publisher CERN
record_format invenio
spelling oai-inspirehep.net-16507142019-09-30T06:29:59Zhttp://cds.cern.ch/record/2302435engSalvachua, BAssmann, R WBruce, RCauchi, MDeboy, DLari, LMarsili, AMirarchi, DQuaranta, ERedaelli, SRossi, AValentino, GLHC collimation cleaning and operation outlookAccelerators and Storage RingsAn overview of the collimation system performance during 2012 is described. The collimator " tight " settings for the 60 cm β reach are introduced and the evolution of the cleaning inefficiency achieved throughout the year with one single collimator alignment is presented. The performance of the semi-automatic collimator alignment tools is discussed. We investigate the beam losses through the cycle with emphasis on the yearly evolution of the measured instantaneous beam lifetime in critical phases of the operational cycle. The concept of collimators with integrated beam positions monitors (BPM) is presented here and their effect on the β reach after the long shutdown I is analyzed. The baseline settings strategy for the startup in 2015 is discussed based on the expected performance of the collima-tors with BPMs. New values of β reach are discussed.CERNoai:inspirehep.net:16507142012
spellingShingle Accelerators and Storage Rings
Salvachua, B
Assmann, R W
Bruce, R
Cauchi, M
Deboy, D
Lari, L
Marsili, A
Mirarchi, D
Quaranta, E
Redaelli, S
Rossi, A
Valentino, G
LHC collimation cleaning and operation outlook
title LHC collimation cleaning and operation outlook
title_full LHC collimation cleaning and operation outlook
title_fullStr LHC collimation cleaning and operation outlook
title_full_unstemmed LHC collimation cleaning and operation outlook
title_short LHC collimation cleaning and operation outlook
title_sort lhc collimation cleaning and operation outlook
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2302435
work_keys_str_mv AT salvachuab lhccollimationcleaningandoperationoutlook
AT assmannrw lhccollimationcleaningandoperationoutlook
AT brucer lhccollimationcleaningandoperationoutlook
AT cauchim lhccollimationcleaningandoperationoutlook
AT deboyd lhccollimationcleaningandoperationoutlook
AT laril lhccollimationcleaningandoperationoutlook
AT marsilia lhccollimationcleaningandoperationoutlook
AT mirarchid lhccollimationcleaningandoperationoutlook
AT quarantae lhccollimationcleaningandoperationoutlook
AT redaellis lhccollimationcleaningandoperationoutlook
AT rossia lhccollimationcleaningandoperationoutlook
AT valentinog lhccollimationcleaningandoperationoutlook