Cargando…
Wrap-up and prospects for post LS1 operations
A terse summary of the workshop is presented in which an attempt is made to highlight issues with direct bearing on post LS1 operation. A preliminary attempt is made to estimate the potential post LS1 performance, outline the commissioning strategy and the potential limitations for run II.
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2302442 |
Sumario: | A terse summary of the workshop is presented in which an attempt is made to
highlight issues with direct bearing on post LS1 operation. A preliminary
attempt is made to estimate the potential post LS1 performance, outline the
commissioning strategy and the potential limitations for run II. |
---|