Cargando…
The HESR Stochastic Cooling System, Design, Construction and Test Experiments in COSY
The construction phase of the stochastic cooling tanks for the HESR has started. Meanwhile two pickups (PU) and one kicker (KI) are fabricated. One PU and one KI are installed into the COSY ring for testing the new stochastic cooling system with real beam at various momenta. Small test-structures we...
Autores principales: | , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-COOL2017-THA11 http://cds.cern.ch/record/2680821 |
_version_ | 1780963009775009792 |
---|---|
author | Stassen, Rolf Breitkreutz, Bernd Shurkhno, Nikolay Stockhorst, Hans Thorndahl, Lars |
author_facet | Stassen, Rolf Breitkreutz, Bernd Shurkhno, Nikolay Stockhorst, Hans Thorndahl, Lars |
author_sort | Stassen, Rolf |
collection | CERN |
description | The construction phase of the stochastic cooling tanks for the HESR has started. Meanwhile two pickups (PU) and one kicker (KI) are fabricated. One PU and one KI are installed into the COSY ring for testing the new stochastic cooling system with real beam at various momenta. Small test-structures were already successfully operated at the Nuclotron in Dubna for longitudinal filter cooling but not for transverse cooling and as small PU in COSY. During the last COSY beam-time in 2017 additional transverse and ToF cooling were achieved. The first two series high power amplifiers were used for cooling and to test the temperature behavior of the combiner-boards at the KI. The system layout includes all components as planned for the HESR like low noise amplifier, switchable delay-lines and optical notch-filter. The HESR needs fast transmission-lines between PU and KI. Beside air-filled coax-lines, optical hollow fiber-lines are very attractive. First results with such a fiber used for the transverse signal path will be presented. |
id | oai-inspirehep.net-1655637 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2018 |
record_format | invenio |
spelling | oai-inspirehep.net-16556372019-09-30T06:29:59Zdoi:10.18429/JACoW-COOL2017-THA11http://cds.cern.ch/record/2680821engStassen, RolfBreitkreutz, BerndShurkhno, NikolayStockhorst, HansThorndahl, LarsThe HESR Stochastic Cooling System, Design, Construction and Test Experiments in COSYAccelerators and Storage RingsThe construction phase of the stochastic cooling tanks for the HESR has started. Meanwhile two pickups (PU) and one kicker (KI) are fabricated. One PU and one KI are installed into the COSY ring for testing the new stochastic cooling system with real beam at various momenta. Small test-structures were already successfully operated at the Nuclotron in Dubna for longitudinal filter cooling but not for transverse cooling and as small PU in COSY. During the last COSY beam-time in 2017 additional transverse and ToF cooling were achieved. The first two series high power amplifiers were used for cooling and to test the temperature behavior of the combiner-boards at the KI. The system layout includes all components as planned for the HESR like low noise amplifier, switchable delay-lines and optical notch-filter. The HESR needs fast transmission-lines between PU and KI. Beside air-filled coax-lines, optical hollow fiber-lines are very attractive. First results with such a fiber used for the transverse signal path will be presented.oai:inspirehep.net:16556372018 |
spellingShingle | Accelerators and Storage Rings Stassen, Rolf Breitkreutz, Bernd Shurkhno, Nikolay Stockhorst, Hans Thorndahl, Lars The HESR Stochastic Cooling System, Design, Construction and Test Experiments in COSY |
title | The HESR Stochastic Cooling System, Design, Construction and Test Experiments in COSY |
title_full | The HESR Stochastic Cooling System, Design, Construction and Test Experiments in COSY |
title_fullStr | The HESR Stochastic Cooling System, Design, Construction and Test Experiments in COSY |
title_full_unstemmed | The HESR Stochastic Cooling System, Design, Construction and Test Experiments in COSY |
title_short | The HESR Stochastic Cooling System, Design, Construction and Test Experiments in COSY |
title_sort | hesr stochastic cooling system, design, construction and test experiments in cosy |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-COOL2017-THA11 http://cds.cern.ch/record/2680821 |
work_keys_str_mv | AT stassenrolf thehesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy AT breitkreutzbernd thehesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy AT shurkhnonikolay thehesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy AT stockhorsthans thehesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy AT thorndahllars thehesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy AT stassenrolf hesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy AT breitkreutzbernd hesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy AT shurkhnonikolay hesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy AT stockhorsthans hesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy AT thorndahllars hesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy |