Cargando…

The HESR Stochastic Cooling System, Design, Construction and Test Experiments in COSY

The construction phase of the stochastic cooling tanks for the HESR has started. Meanwhile two pickups (PU) and one kicker (KI) are fabricated. One PU and one KI are installed into the COSY ring for testing the new stochastic cooling system with real beam at various momenta. Small test-structures we...

Descripción completa

Detalles Bibliográficos
Autores principales: Stassen, Rolf, Breitkreutz, Bernd, Shurkhno, Nikolay, Stockhorst, Hans, Thorndahl, Lars
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-COOL2017-THA11
http://cds.cern.ch/record/2680821
_version_ 1780963009775009792
author Stassen, Rolf
Breitkreutz, Bernd
Shurkhno, Nikolay
Stockhorst, Hans
Thorndahl, Lars
author_facet Stassen, Rolf
Breitkreutz, Bernd
Shurkhno, Nikolay
Stockhorst, Hans
Thorndahl, Lars
author_sort Stassen, Rolf
collection CERN
description The construction phase of the stochastic cooling tanks for the HESR has started. Meanwhile two pickups (PU) and one kicker (KI) are fabricated. One PU and one KI are installed into the COSY ring for testing the new stochastic cooling system with real beam at various momenta. Small test-structures were already successfully operated at the Nuclotron in Dubna for longitudinal filter cooling but not for transverse cooling and as small PU in COSY. During the last COSY beam-time in 2017 additional transverse and ToF cooling were achieved. The first two series high power amplifiers were used for cooling and to test the temperature behavior of the combiner-boards at the KI. The system layout includes all components as planned for the HESR like low noise amplifier, switchable delay-lines and optical notch-filter. The HESR needs fast transmission-lines between PU and KI. Beside air-filled coax-lines, optical hollow fiber-lines are very attractive. First results with such a fiber used for the transverse signal path will be presented.
id oai-inspirehep.net-1655637
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2018
record_format invenio
spelling oai-inspirehep.net-16556372019-09-30T06:29:59Zdoi:10.18429/JACoW-COOL2017-THA11http://cds.cern.ch/record/2680821engStassen, RolfBreitkreutz, BerndShurkhno, NikolayStockhorst, HansThorndahl, LarsThe HESR Stochastic Cooling System, Design, Construction and Test Experiments in COSYAccelerators and Storage RingsThe construction phase of the stochastic cooling tanks for the HESR has started. Meanwhile two pickups (PU) and one kicker (KI) are fabricated. One PU and one KI are installed into the COSY ring for testing the new stochastic cooling system with real beam at various momenta. Small test-structures were already successfully operated at the Nuclotron in Dubna for longitudinal filter cooling but not for transverse cooling and as small PU in COSY. During the last COSY beam-time in 2017 additional transverse and ToF cooling were achieved. The first two series high power amplifiers were used for cooling and to test the temperature behavior of the combiner-boards at the KI. The system layout includes all components as planned for the HESR like low noise amplifier, switchable delay-lines and optical notch-filter. The HESR needs fast transmission-lines between PU and KI. Beside air-filled coax-lines, optical hollow fiber-lines are very attractive. First results with such a fiber used for the transverse signal path will be presented.oai:inspirehep.net:16556372018
spellingShingle Accelerators and Storage Rings
Stassen, Rolf
Breitkreutz, Bernd
Shurkhno, Nikolay
Stockhorst, Hans
Thorndahl, Lars
The HESR Stochastic Cooling System, Design, Construction and Test Experiments in COSY
title The HESR Stochastic Cooling System, Design, Construction and Test Experiments in COSY
title_full The HESR Stochastic Cooling System, Design, Construction and Test Experiments in COSY
title_fullStr The HESR Stochastic Cooling System, Design, Construction and Test Experiments in COSY
title_full_unstemmed The HESR Stochastic Cooling System, Design, Construction and Test Experiments in COSY
title_short The HESR Stochastic Cooling System, Design, Construction and Test Experiments in COSY
title_sort hesr stochastic cooling system, design, construction and test experiments in cosy
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-COOL2017-THA11
http://cds.cern.ch/record/2680821
work_keys_str_mv AT stassenrolf thehesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy
AT breitkreutzbernd thehesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy
AT shurkhnonikolay thehesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy
AT stockhorsthans thehesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy
AT thorndahllars thehesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy
AT stassenrolf hesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy
AT breitkreutzbernd hesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy
AT shurkhnonikolay hesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy
AT stockhorsthans hesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy
AT thorndahllars hesrstochasticcoolingsystemdesignconstructionandtestexperimentsincosy