Virtual control commissioning for a large critical ventilation system: The CMS cavern use case
The current cavern ventilation control system of the CMS experiment at CERN is based on components which are already obsolete: the SCADA system, or close to the end of life: the PLCs. The control system is going to be upgraded during the LHC Long Shutdown 2 (2019-2020) and will be based on the CERN...
Autores principales: | Booth, William, Blanco Viñuela, Enrique, Bradu, Benjamin, Sourisseau, Samuel |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-ICALEPCS2017-MODPL02 http://cds.cern.ch/record/2306216 |
Ejemplares similares
-
Commissioning of the CMS Cryogenic System After Final Installation in the Underground Cavern
por: Dupont, T, et al.
Publicado: (2010) -
Automatic PID performance monitoring applied to LHC cryogenics
por: Bradu, Benjamin, et al.
Publicado: (2018) -
Online analysis for anticipated failure diagnostics of the CERN cryogenic systems
por: Gayet, Philippe, et al.
Publicado: (2018) -
A Modular Approach to Develop Standardized HVAC Control Systems with UNICOS CPC Framework
por: Booth, William, et al.
Publicado: (2015) -
A Simulation Study for the Virtual Commissioning of the CERN Central Helium Liquefier
por: Rogez, E, et al.
Publicado: (2008)