Cargando…
LHC train control system for autonomous inspections and measurements
Intelligent robotic systems are becoming essential for inspection and measurements in harsh environments, such as the European Organization for Nuclear Research (CERN) accelerators complex. Aiming at increasing safety and machine availability, robots can help to perform repetitive or dangerous tasks...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-ICALEPCS2017-THPHA061 http://cds.cern.ch/record/2305645 |
_version_ | 1780957553546493952 |
---|---|
author | Di Castro, Mario Baiguera Tambutti, Maria Laura Gilardoni, Simone Losito, Roberto Lunghi, Giacomo Masi, Alessandro |
author_facet | Di Castro, Mario Baiguera Tambutti, Maria Laura Gilardoni, Simone Losito, Roberto Lunghi, Giacomo Masi, Alessandro |
author_sort | Di Castro, Mario |
collection | CERN |
description | Intelligent robotic systems are becoming essential for inspection and measurements in harsh environments, such as the European Organization for Nuclear Research (CERN) accelerators complex. Aiming at increasing safety and machine availability, robots can help to perform repetitive or dangerous tasks, reducing the risk for the personnel as the exposure to radiation. The Large Hadron Collider (LHC) tunnel at CERN has been equipped with fail-safe trains on monorail able to perform autonomously different missions as radiation survey, civil infrastructures monitoring through photogrammetry, fire detection as well as survey measurements of accelerator devices. In this paper, the entire control architecture and the design of the low-level control to fulfil the requirements and the challenges of the LHC tunnel are described. The train low-level control is based on a PLC controller that communicates with the surface via 4G through VPN, where a user-friendly graphical user interface allows the operation of the robot. The low-level controller includes a PLC fail-safe program to ensure the safety of the system. The results of the commissioning in the LHC are presented. |
id | oai-inspirehep.net-1655775 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2018 |
record_format | invenio |
spelling | oai-inspirehep.net-16557752019-09-30T06:29:59Zdoi:10.18429/JACoW-ICALEPCS2017-THPHA061http://cds.cern.ch/record/2305645engDi Castro, MarioBaiguera Tambutti, Maria LauraGilardoni, SimoneLosito, RobertoLunghi, GiacomoMasi, AlessandroLHC train control system for autonomous inspections and measurementsAccelerators and Storage RingsIntelligent robotic systems are becoming essential for inspection and measurements in harsh environments, such as the European Organization for Nuclear Research (CERN) accelerators complex. Aiming at increasing safety and machine availability, robots can help to perform repetitive or dangerous tasks, reducing the risk for the personnel as the exposure to radiation. The Large Hadron Collider (LHC) tunnel at CERN has been equipped with fail-safe trains on monorail able to perform autonomously different missions as radiation survey, civil infrastructures monitoring through photogrammetry, fire detection as well as survey measurements of accelerator devices. In this paper, the entire control architecture and the design of the low-level control to fulfil the requirements and the challenges of the LHC tunnel are described. The train low-level control is based on a PLC controller that communicates with the surface via 4G through VPN, where a user-friendly graphical user interface allows the operation of the robot. The low-level controller includes a PLC fail-safe program to ensure the safety of the system. The results of the commissioning in the LHC are presented.oai:inspirehep.net:16557752018 |
spellingShingle | Accelerators and Storage Rings Di Castro, Mario Baiguera Tambutti, Maria Laura Gilardoni, Simone Losito, Roberto Lunghi, Giacomo Masi, Alessandro LHC train control system for autonomous inspections and measurements |
title | LHC train control system for autonomous inspections and measurements |
title_full | LHC train control system for autonomous inspections and measurements |
title_fullStr | LHC train control system for autonomous inspections and measurements |
title_full_unstemmed | LHC train control system for autonomous inspections and measurements |
title_short | LHC train control system for autonomous inspections and measurements |
title_sort | lhc train control system for autonomous inspections and measurements |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-ICALEPCS2017-THPHA061 http://cds.cern.ch/record/2305645 |
work_keys_str_mv | AT dicastromario lhctraincontrolsystemforautonomousinspectionsandmeasurements AT baigueratambuttimarialaura lhctraincontrolsystemforautonomousinspectionsandmeasurements AT gilardonisimone lhctraincontrolsystemforautonomousinspectionsandmeasurements AT lositoroberto lhctraincontrolsystemforautonomousinspectionsandmeasurements AT lunghigiacomo lhctraincontrolsystemforautonomousinspectionsandmeasurements AT masialessandro lhctraincontrolsystemforautonomousinspectionsandmeasurements |