Cargando…
A new distributed control system for the consolidation of the CERN tertiary infrastructures
The operation of the CERN tertiary infrastructures is carried out via a series of control systems distributed over the CERN sites (Meyrin and Prevessin). The scope comprises: $\sim$ 260 buildings, 2 large heating plants ($\sim$ 50 MW overall capacity) with 27 km heating network and 200 radiators cir...
Autores principales: | Scibile, Luigi, Martel, Christophe, Villeton Pachot, Patrick |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-ICALEPCS2017-TUPHA011 http://cds.cern.ch/record/2305657 |
Ejemplares similares
-
Chapter 5 Infrastructure consolidation
por: Burdelski, P, et al.
Publicado: (2021) -
The Consolidation of the CERN Beam Interlock System
por: Johnson, Roland, et al.
Publicado: (2021) -
Integration of Industrial Equipment and Distributed Control Systems into the Control Infrastructure at CERN
por: Lauckner, R J, et al.
Publicado: (1997) -
CERN Safety Alarms Monitoring System (CSAM
por: Elena Manola-Poggioli, Elena Manola-Poggioli, et al.
Publicado: (2006) -
The LHC Access Control System
por: Ninin, Pierre, et al.
Publicado: (2004)