Upgrade of the power triggering system of the LHC beam dumping system

The beam dumping system of CERN's Large Hadron Collider (LHC) is equipped with fast solid state closing switches composed of a stack of ten series connected Fast High Current Thyristors (FHCT). The triggering circuit of these switches consists of a 10:1 trigger transformer, with stray inductanc...

Descripción completa

Detalles Bibliográficos
Autores principales: Allonneau, L, Carlier, E, Senaj, V
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.1109/PPC.2017.8291246
http://cds.cern.ch/record/2311931
_version_ 1780957959279345664
author Allonneau, L
Carlier, E
Senaj, V
author_facet Allonneau, L
Carlier, E
Senaj, V
author_sort Allonneau, L
collection CERN
description The beam dumping system of CERN's Large Hadron Collider (LHC) is equipped with fast solid state closing switches composed of a stack of ten series connected Fast High Current Thyristors (FHCT). The triggering circuit of these switches consists of a 10:1 trigger transformer, with stray inductance of 5 μH, powered by two redundant Power Trigger Modules (PTM) delivering 520 A peak gate current with rate of rise of 460 A/μs. Operational experience gained since the commissioning of the system in 1998 has identified performance limitation of the LHC Beam Dumping System (LBDS) that could be solved by increasing the triggering current. In view of the operation of the LHC with higher luminosity beams in the coming years, an upgrade of the LBDS triggering system is proposed. The objective is an increase of the FHCT gate current to 2 kA peak with a rate of rise of 4 kA/μs, which will increase the FHCT lifetime and reduce the switching time and losses. These new performances will be obtained by the design of a faster low inductance trigger transformer; a reduction of the trigger cable inductance and an optimization of the present PTM electrical circuit. This paper will present the different modifications proposed for the PTM. First encouraging results obtained with a slightly modified PTM and new prototype trigger transformer will also be discussed.
id oai-inspirehep.net-1665658
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2018
record_format invenio
spelling oai-inspirehep.net-16656582019-09-30T06:29:59Zdoi:10.1109/PPC.2017.8291246http://cds.cern.ch/record/2311931engAllonneau, LCarlier, ESenaj, VUpgrade of the power triggering system of the LHC beam dumping systemAccelerators and Storage RingsThe beam dumping system of CERN's Large Hadron Collider (LHC) is equipped with fast solid state closing switches composed of a stack of ten series connected Fast High Current Thyristors (FHCT). The triggering circuit of these switches consists of a 10:1 trigger transformer, with stray inductance of 5 μH, powered by two redundant Power Trigger Modules (PTM) delivering 520 A peak gate current with rate of rise of 460 A/μs. Operational experience gained since the commissioning of the system in 1998 has identified performance limitation of the LHC Beam Dumping System (LBDS) that could be solved by increasing the triggering current. In view of the operation of the LHC with higher luminosity beams in the coming years, an upgrade of the LBDS triggering system is proposed. The objective is an increase of the FHCT gate current to 2 kA peak with a rate of rise of 4 kA/μs, which will increase the FHCT lifetime and reduce the switching time and losses. These new performances will be obtained by the design of a faster low inductance trigger transformer; a reduction of the trigger cable inductance and an optimization of the present PTM electrical circuit. This paper will present the different modifications proposed for the PTM. First encouraging results obtained with a slightly modified PTM and new prototype trigger transformer will also be discussed.oai:inspirehep.net:16656582018
spellingShingle Accelerators and Storage Rings
Allonneau, L
Carlier, E
Senaj, V
Upgrade of the power triggering system of the LHC beam dumping system
title Upgrade of the power triggering system of the LHC beam dumping system
title_full Upgrade of the power triggering system of the LHC beam dumping system
title_fullStr Upgrade of the power triggering system of the LHC beam dumping system
title_full_unstemmed Upgrade of the power triggering system of the LHC beam dumping system
title_short Upgrade of the power triggering system of the LHC beam dumping system
title_sort upgrade of the power triggering system of the lhc beam dumping system
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1109/PPC.2017.8291246
http://cds.cern.ch/record/2311931
work_keys_str_mv AT allonneaul upgradeofthepowertriggeringsystemofthelhcbeamdumpingsystem
AT carliere upgradeofthepowertriggeringsystemofthelhcbeamdumpingsystem
AT senajv upgradeofthepowertriggeringsystemofthelhcbeamdumpingsystem