Test results of TQS03: A LARP shell-based Nb$_3$Sn quadrupole using 108/127 conductor

Future insertion quadrupoles with large apertures and high gradients will be required for the Phase II luminosity upgrade (10$^{35}$ cm$^{−2}$s$^{−1}$) of the Large Hadron Collider (LHC). Although improved designs, based on NbTi, are being considered as an intermediate step for the Phase I upgrade,...

Descripción completa

Detalles Bibliográficos
Autores principales: Felice, H, Ambrosio, G, Bajko, M, Barzi, E, Bordini, B, Bossert, R, Caspi, S, Dietderich, D, Ferracin, P, Feuvrier, J, Ghosh, A, Godeke, A, Lizarazo, J, Rossi, L, Sabbi, G, Wanderer, P, Wang, X, Zlobin, A V
Lenguaje:eng
Publicado: 2010
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1742-6596/234/3/032010
http://cds.cern.ch/record/2631730
Descripción
Sumario:Future insertion quadrupoles with large apertures and high gradients will be required for the Phase II luminosity upgrade (10$^{35}$ cm$^{−2}$s$^{−1}$) of the Large Hadron Collider (LHC). Although improved designs, based on NbTi, are being considered as an intermediate step for the Phase I upgrade, the Nb$_3$Sn conductor is presently the best option that meets the ultimate performance goals for both operating field and temperature margin. As part of the development of Nb$_3$Sn magnet technology, the LHC Accelerator Research Program (LARP) developed and tested several 1-meter long, 90-mm aperture Nb$_3$Sn quadrupoles. The first two series of magnet used OST MJR 54/61 (TQ01 series) and OST RRP 54/61 (TQ02 series) strands. The third series (TQ03) used OST RRP 108/127 conductor. The larger number of sub-elements and the consequent reduction of the effective filament size, together with an increased fraction of copper and a lower Jc were expected to improve the conductor stability. The new coils were tested in the TQS03 series using a shell structure assembled with keys and bladders. The objective of the first test (TQS03a) was to evaluate the performances of the 108/127 conductor and, in particular, its behaviour at 1.9 K, while the second test (TQS03b) investigated the impact on high azimuthal pre-stress on the magnet performance. This paper reports on TQS03 fabrication, the strain gauge measurements performed during assembly, cool-down, excitation and the quench behaviour of the two magnets.