Cargando…
The latency validation of the optical link for the ATLAS Liquid Argon Calorimeter Phase-I trigger upgrade
Two optical data link data transmission Application Specific Integrated Circuits (ASICs), the baseline and its backup, have been designed for the ATLAS Liquid Argon (LAr) Calorimeter Phase-I trigger upgrade. The latency of each ASIC and that of its corresponding receiver implemented in a back-end Fi...
Autores principales: | Deng, Binwei, Xiao, Le, Zhao, Xiandong, Baker, Emily, Gong, Datao, Guo, D., He, Huiqin, Hou, Suen, Liu, Chonghan, Liu, Tiankuan, Sun, Quan, Thomas, James, Wang, Jian, Xiang, Annie C., Yang, Dongxu, Ye, Jingbo, Zhou, Wei |
---|---|
Lenguaje: | eng |
Publicado: |
2020
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1748-0221/13/05/P05002 http://cds.cern.ch/record/2658035 |
Ejemplares similares
-
Two low-power optical data transmission ASICs for the ATLAS Liquid Argon Calorimeter readout upgrade
por: Xiao, Le, et al.
Publicado: (2020) -
A low-latency, low-overhead encoder for data transmission in the ATLAS Liquid Argon Calorimeter trigger upgrade
por: Xiao, Le, et al.
Publicado: (2016) -
Component Prototypes Towards a Low-Latency, Small-Form-Factor Optical Link for the ATLAS Liquid Argon Calorimeter Phase-I Trigger Upgrade
por: Deng, Binwei, et al.
Publicado: (2015) -
Design and hardware evaluation of the optical-link system for the ATLAS Liquid Argon Calorimeter Phase-II Upgrade
por: Deng, Binwei, et al.
Publicado: (2020) -
LOCx2, a low-latency, low-overhead, 2 × 5.12-Gbps transmitter ASIC for the ATLAS Liquid Argon Calorimeter trigger upgrade
por: Xiao, Le, et al.
Publicado: (2020)