Refrigeration assessment of the existing cryogenic plants for the high luminosity upgrade of the Large Hadron Collider (LHC)

The cryogenic system of the LHC will be upgraded by 2025 to comply with a considerable increase of beam induced heat loads deriving from higher beam currents and peak luminosity levels from the High Luminosity LHC. The current baseline foresees a modified sectorisation scheme with three additional c...

Descripción completa

Detalles Bibliográficos
Autores principales: Berkowitz Zamora, D, Claudet, S, Perin, A
Lenguaje:eng
Publicado: 2017
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1757-899X/278/1/012099
http://cds.cern.ch/record/2621060
_version_ 1780958567835107328
author Berkowitz Zamora, D
Claudet, S
Perin, A
author_facet Berkowitz Zamora, D
Claudet, S
Perin, A
author_sort Berkowitz Zamora, D
collection CERN
description The cryogenic system of the LHC will be upgraded by 2025 to comply with a considerable increase of beam induced heat loads deriving from higher beam currents and peak luminosity levels from the High Luminosity LHC. The current baseline foresees a modified sectorisation scheme with three additional cryogenic plants dedicated to cool the insertions at LHC's points 1, 4 and 5, reducing the refrigeration duty of the existent adjacent plants. This paper assesses the refrigeration duty of the eight existing plants considering the modified sectorisation and increased heat load deposition. The accelerator loads and distribution losses are quantified for each plant and compared to the existing refrigeration capacity. The heat load values were obtained from the extrapolation of previous LHC assessments as well as from new calculations. Specifically for the LHC point 4 cryogenic equipment, based on updated refrigeration requirements, the upgrade of an existing plant is proposed as an alternative to the baseline scenario.
id oai-inspirehep.net-1675374
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2017
record_format invenio
spelling oai-inspirehep.net-16753742022-08-17T12:59:27Zdoi:10.1088/1757-899X/278/1/012099http://cds.cern.ch/record/2621060engBerkowitz Zamora, DClaudet, SPerin, ARefrigeration assessment of the existing cryogenic plants for the high luminosity upgrade of the Large Hadron Collider (LHC)Accelerators and Storage RingsThe cryogenic system of the LHC will be upgraded by 2025 to comply with a considerable increase of beam induced heat loads deriving from higher beam currents and peak luminosity levels from the High Luminosity LHC. The current baseline foresees a modified sectorisation scheme with three additional cryogenic plants dedicated to cool the insertions at LHC's points 1, 4 and 5, reducing the refrigeration duty of the existent adjacent plants. This paper assesses the refrigeration duty of the eight existing plants considering the modified sectorisation and increased heat load deposition. The accelerator loads and distribution losses are quantified for each plant and compared to the existing refrigeration capacity. The heat load values were obtained from the extrapolation of previous LHC assessments as well as from new calculations. Specifically for the LHC point 4 cryogenic equipment, based on updated refrigeration requirements, the upgrade of an existing plant is proposed as an alternative to the baseline scenario.oai:inspirehep.net:16753742017
spellingShingle Accelerators and Storage Rings
Berkowitz Zamora, D
Claudet, S
Perin, A
Refrigeration assessment of the existing cryogenic plants for the high luminosity upgrade of the Large Hadron Collider (LHC)
title Refrigeration assessment of the existing cryogenic plants for the high luminosity upgrade of the Large Hadron Collider (LHC)
title_full Refrigeration assessment of the existing cryogenic plants for the high luminosity upgrade of the Large Hadron Collider (LHC)
title_fullStr Refrigeration assessment of the existing cryogenic plants for the high luminosity upgrade of the Large Hadron Collider (LHC)
title_full_unstemmed Refrigeration assessment of the existing cryogenic plants for the high luminosity upgrade of the Large Hadron Collider (LHC)
title_short Refrigeration assessment of the existing cryogenic plants for the high luminosity upgrade of the Large Hadron Collider (LHC)
title_sort refrigeration assessment of the existing cryogenic plants for the high luminosity upgrade of the large hadron collider (lhc)
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1088/1757-899X/278/1/012099
http://cds.cern.ch/record/2621060
work_keys_str_mv AT berkowitzzamorad refrigerationassessmentoftheexistingcryogenicplantsforthehighluminosityupgradeofthelargehadroncolliderlhc
AT claudets refrigerationassessmentoftheexistingcryogenicplantsforthehighluminosityupgradeofthelargehadroncolliderlhc
AT perina refrigerationassessmentoftheexistingcryogenicplantsforthehighluminosityupgradeofthelargehadroncolliderlhc