Cargando…
Upgrade of the cryogenic infrastructure of SM18, CERN main test facility for superconducting magnets and RF cavities
SM18 is CERN main facility for testing superconducting accelerator magnets and superconducting RF cavities. Its cryogenic infrastructure will have to be significantly upgraded in the coming years, starting in 2019, to meet the testing requirements for the LHC High Luminosity project and for the R&am...
Autores principales: | Perin, A, Dhalla, F, Gayet, P, Serio, L |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1757-899X/278/1/012112 http://cds.cern.ch/record/2621061 |
Ejemplares similares
-
Cryogenics for superconducting rf cavities in LEP
por: Schmid, J
Publicado: (1984) -
Upgrade of the Cryogenic CERN RF Test Facility
por: Pirotte, O, et al.
Publicado: (2014) -
Cryogenic Losses In Superconducting RF Cavities For LEP
por: Lengeler, Herbert
Publicado: (1980) -
Cryogenics for the LEP200 superconducting cavities at CERN
por: Güsewell, D, et al.
Publicado: (1993) -
Design, Procurement, Installation and Commissioning of the Cryogenic Infrastructure for a New Superconducting RF Test Facility with Beam at CERN
por: Delprat, L, et al.
Publicado: (2020)