Cargando…
Linac4 Commissioning Status and Challenges to Nominal Operation
Linac4 will be connected to the Proton Synchrotron Booster (PSB) during the next long LHC shutdown in 2019 and it will operationally replace Linac2 as provider of protons to the CERN complex as of 2021. Commissioning to the final beam energy of 160 MeV was achieved by the end of 2016. Linac4 is pres...
Autor principal: | Bellodi, Giulia |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-HB2018-MOA1PL03 http://cds.cern.ch/record/2640632 |
Ejemplares similares
-
Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN
por: Rossi, Carlo, et al.
Publicado: (2014) -
Linac4 chopper line commissioning strategy
por: Bellodi, G, et al.
Publicado: (2010) -
Longitudinal Beam Profile Measurements in Linac4 Commissioning
por: Bellodi, Giulia, et al.
Publicado: (2014) -
Beam Commissioning of Linac4 up to 12 MeV
por: Dimov, Veliko, et al.
Publicado: (2015) -
Linac4 chopper line commissioning strategy
por: Bellodi, G, et al.
Publicado: (2010)