Cargando…

Linac4 Commissioning Status and Challenges to Nominal Operation

Linac4 will be connected to the Proton Synchrotron Booster (PSB) during the next long LHC shutdown in 2019 and it will operationally replace Linac2 as provider of protons to the CERN complex as of 2021. Commissioning to the final beam energy of 160 MeV was achieved by the end of 2016. Linac4 is pres...

Descripción completa

Detalles Bibliográficos
Autor principal: Bellodi, Giulia
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-HB2018-MOA1PL03
http://cds.cern.ch/record/2640632

Ejemplares similares