Cargando…
Upgrade of PIAVE Superconducting RFQs at INFN-Legnaro
Superconducting RFQs (SRFQs), the first SC RFQs ever made operational for users, have been operated on the PIAVE SC heavy ion linac injector at INFN-Legnaro since 2006. The structure is split into two resonators and is limited to the accelerating RFQ sections. The resonators had never exceeded 80% o...
Autores principales: | , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2018-THPAL007 https://dx.doi.org/10.1088/1742-6596/1067/8/082008 http://cds.cern.ch/record/2673661 |
_version_ | 1780962524897738752 |
---|---|
author | Bisoffi, Giovanni Andreev, Vladimir Bissiato, Enzo Bortolato, Damiano Bosotti, Angelo Chiurlotto, Francesca Contran, Tiziano Fagotti, Enrico Ferreira, Leonel Kasprzak, Karol Minarello, Alessandro Modanese, Paolo Munaron, Enrico Paparella, Rocco Pardo, Richard Scarpa, Daniele |
author_facet | Bisoffi, Giovanni Andreev, Vladimir Bissiato, Enzo Bortolato, Damiano Bosotti, Angelo Chiurlotto, Francesca Contran, Tiziano Fagotti, Enrico Ferreira, Leonel Kasprzak, Karol Minarello, Alessandro Modanese, Paolo Munaron, Enrico Paparella, Rocco Pardo, Richard Scarpa, Daniele |
author_sort | Bisoffi, Giovanni |
collection | CERN |
description | Superconducting RFQs (SRFQs), the first SC RFQs ever made operational for users, have been operated on the PIAVE SC heavy ion linac injector at INFN-Legnaro since 2006. The structure is split into two resonators and is limited to the accelerating RFQ sections. The resonators had never exceeded 80% of the design accelerating fields. In 2015, an upgrade plan started, aimed at increasing the accelerating fields, while improving their slow and fast tuning systems, repairing degraded components, imple-menting a LASER alignment method. The upgrade plan was successfully concluded in summer 2017. The resona-tors were kept stably locked for days at a field larger than the nominal one. Eventually, a test beam was accelerated successfully for 72 hours, with negligible locking issues. SRFQs entered once again routine operation in December 2017. The new features will allow to accelerate heavy ions with an A/q value as high as 8.5 (versus a former maximum A/q=7.5), allowing operation of the very first accelerated uranium beams at INFN-LNL, after the relat-ed authorizations shall have been issued. |
id | oai-inspirehep.net-1689728 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2018 |
record_format | invenio |
spelling | oai-inspirehep.net-16897282021-02-09T10:06:28Zdoi:10.18429/JACoW-IPAC2018-THPAL007doi:10.1088/1742-6596/1067/8/082008http://cds.cern.ch/record/2673661engBisoffi, GiovanniAndreev, VladimirBissiato, EnzoBortolato, DamianoBosotti, AngeloChiurlotto, FrancescaContran, TizianoFagotti, EnricoFerreira, LeonelKasprzak, KarolMinarello, AlessandroModanese, PaoloMunaron, EnricoPaparella, RoccoPardo, RichardScarpa, DanieleUpgrade of PIAVE Superconducting RFQs at INFN-LegnaroAccelerators and Storage RingsSuperconducting RFQs (SRFQs), the first SC RFQs ever made operational for users, have been operated on the PIAVE SC heavy ion linac injector at INFN-Legnaro since 2006. The structure is split into two resonators and is limited to the accelerating RFQ sections. The resonators had never exceeded 80% of the design accelerating fields. In 2015, an upgrade plan started, aimed at increasing the accelerating fields, while improving their slow and fast tuning systems, repairing degraded components, imple-menting a LASER alignment method. The upgrade plan was successfully concluded in summer 2017. The resona-tors were kept stably locked for days at a field larger than the nominal one. Eventually, a test beam was accelerated successfully for 72 hours, with negligible locking issues. SRFQs entered once again routine operation in December 2017. The new features will allow to accelerate heavy ions with an A/q value as high as 8.5 (versus a former maximum A/q=7.5), allowing operation of the very first accelerated uranium beams at INFN-LNL, after the relat-ed authorizations shall have been issued.Superconducting RFQs (SRFQs), the first SC RFQs ever made operational for users, have been operated on the PIAVE SC heavy ion linac injector at INFN-Legnaro since 2006. The structure is split into two resonators and is limited to the accelerating RFQ sections. The resonators had never exceeded 80% of the design accelerating fields. In 2015, an upgrade plan started, aimed at increasing the accelerating fields, while improving their slow and fast tuning systems, repairing degraded components, implementing a LASER alignment method. The upgrade plan was successfully concluded in summer 2017. The resonators were kept stably locked for days at a field larger than the nominal one. Eventually, a test beam was accelerated successfully for 72 hours, with negligible locking issues. SRFQs entered once again routine operation in December 2017. The new features will allow to accelerate heavy ions with an A/q value as high as 8.5 (versus a former maximum A/q = 7.5), allowing operation of the very first accelerated uranium beams at INFN-LNL, after the related authorizations shall have been issued.oai:inspirehep.net:16897282018 |
spellingShingle | Accelerators and Storage Rings Bisoffi, Giovanni Andreev, Vladimir Bissiato, Enzo Bortolato, Damiano Bosotti, Angelo Chiurlotto, Francesca Contran, Tiziano Fagotti, Enrico Ferreira, Leonel Kasprzak, Karol Minarello, Alessandro Modanese, Paolo Munaron, Enrico Paparella, Rocco Pardo, Richard Scarpa, Daniele Upgrade of PIAVE Superconducting RFQs at INFN-Legnaro |
title | Upgrade of PIAVE Superconducting RFQs at INFN-Legnaro |
title_full | Upgrade of PIAVE Superconducting RFQs at INFN-Legnaro |
title_fullStr | Upgrade of PIAVE Superconducting RFQs at INFN-Legnaro |
title_full_unstemmed | Upgrade of PIAVE Superconducting RFQs at INFN-Legnaro |
title_short | Upgrade of PIAVE Superconducting RFQs at INFN-Legnaro |
title_sort | upgrade of piave superconducting rfqs at infn-legnaro |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2018-THPAL007 https://dx.doi.org/10.1088/1742-6596/1067/8/082008 http://cds.cern.ch/record/2673661 |
work_keys_str_mv | AT bisoffigiovanni upgradeofpiavesuperconductingrfqsatinfnlegnaro AT andreevvladimir upgradeofpiavesuperconductingrfqsatinfnlegnaro AT bissiatoenzo upgradeofpiavesuperconductingrfqsatinfnlegnaro AT bortolatodamiano upgradeofpiavesuperconductingrfqsatinfnlegnaro AT bosottiangelo upgradeofpiavesuperconductingrfqsatinfnlegnaro AT chiurlottofrancesca upgradeofpiavesuperconductingrfqsatinfnlegnaro AT contrantiziano upgradeofpiavesuperconductingrfqsatinfnlegnaro AT fagottienrico upgradeofpiavesuperconductingrfqsatinfnlegnaro AT ferreiraleonel upgradeofpiavesuperconductingrfqsatinfnlegnaro AT kasprzakkarol upgradeofpiavesuperconductingrfqsatinfnlegnaro AT minarelloalessandro upgradeofpiavesuperconductingrfqsatinfnlegnaro AT modanesepaolo upgradeofpiavesuperconductingrfqsatinfnlegnaro AT munaronenrico upgradeofpiavesuperconductingrfqsatinfnlegnaro AT paparellarocco upgradeofpiavesuperconductingrfqsatinfnlegnaro AT pardorichard upgradeofpiavesuperconductingrfqsatinfnlegnaro AT scarpadaniele upgradeofpiavesuperconductingrfqsatinfnlegnaro |