The New 20 kA 80 V Power Supply for the 520 MeV H$^-$ Cyclotron at TRIUMF
The new 20 kA, 80 V power supply for the main magnet of the 520 MeV H⁻ Cyclotron at TRIUMF was awarded to OCEM. It has replaced the original system (commissioned in 1976) based on a series pass regulator. The final acceptance tests have demonstrated the com-pliance with the project specifications, e...
Autores principales: | , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2018-THPAL062 http://cds.cern.ch/record/2673662 |
_version_ | 1780962525112696832 |
---|---|
author | Carrozza, Saverino Bastos, Miguel Bondesan, Luca Burnet, Jean-Paul Bylinski, Yu Hudson, Gregory King, Quentin Le Godec, Gilles Leung, Arthur Louie, Dan Mammarella, Franco Michels, Olivier Morato, Alessandro Nussbaumer, Rod Pretelli, Miguel Taddia, Giuseppe Valencia, Claudio |
author_facet | Carrozza, Saverino Bastos, Miguel Bondesan, Luca Burnet, Jean-Paul Bylinski, Yu Hudson, Gregory King, Quentin Le Godec, Gilles Leung, Arthur Louie, Dan Mammarella, Franco Michels, Olivier Morato, Alessandro Nussbaumer, Rod Pretelli, Miguel Taddia, Giuseppe Valencia, Claudio |
author_sort | Carrozza, Saverino |
collection | CERN |
description | The new 20 kA, 80 V power supply for the main magnet of the 520 MeV H⁻ Cyclotron at TRIUMF was awarded to OCEM. It has replaced the original system (commissioned in 1976) based on a series pass regulator. The final acceptance tests have demonstrated the com-pliance with the project specifications, especially for the high current stability required for the Cyclotron operation. The current stability is ±5 ppm, including current ripple, for a period of more than 8 hours of continuous operation. In addition, the magnetic field can be further stabilized us-ing feedback of a flux loop signal. OCEM designed the power supply to use the third gen-eration of Function Generator/Controller (FGC3) control electronics from CERN. This was chosen to obtain the high current stability required by TRIUMF. This collaboration was facilitated through a Knowledge Transfer agreement between CERN and OCEM. The power supply commis-sioning has been performed as a collaboration between OCEM, TRIUMF and CERN. This paper describes the topology of the power supply, the control electronics, the high-precision current measure-ment system and the associated software as well as the commissioning results carried out with the magnet. |
id | oai-inspirehep.net-1689772 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2018 |
record_format | invenio |
spelling | oai-inspirehep.net-16897722019-09-30T06:29:59Zdoi:10.18429/JACoW-IPAC2018-THPAL062http://cds.cern.ch/record/2673662engCarrozza, SaverinoBastos, MiguelBondesan, LucaBurnet, Jean-PaulBylinski, YuHudson, GregoryKing, QuentinLe Godec, GillesLeung, ArthurLouie, DanMammarella, FrancoMichels, OlivierMorato, AlessandroNussbaumer, RodPretelli, MiguelTaddia, GiuseppeValencia, ClaudioThe New 20 kA 80 V Power Supply for the 520 MeV H$^-$ Cyclotron at TRIUMFAccelerators and Storage RingsThe new 20 kA, 80 V power supply for the main magnet of the 520 MeV H⁻ Cyclotron at TRIUMF was awarded to OCEM. It has replaced the original system (commissioned in 1976) based on a series pass regulator. The final acceptance tests have demonstrated the com-pliance with the project specifications, especially for the high current stability required for the Cyclotron operation. The current stability is ±5 ppm, including current ripple, for a period of more than 8 hours of continuous operation. In addition, the magnetic field can be further stabilized us-ing feedback of a flux loop signal. OCEM designed the power supply to use the third gen-eration of Function Generator/Controller (FGC3) control electronics from CERN. This was chosen to obtain the high current stability required by TRIUMF. This collaboration was facilitated through a Knowledge Transfer agreement between CERN and OCEM. The power supply commis-sioning has been performed as a collaboration between OCEM, TRIUMF and CERN. This paper describes the topology of the power supply, the control electronics, the high-precision current measure-ment system and the associated software as well as the commissioning results carried out with the magnet.oai:inspirehep.net:16897722018 |
spellingShingle | Accelerators and Storage Rings Carrozza, Saverino Bastos, Miguel Bondesan, Luca Burnet, Jean-Paul Bylinski, Yu Hudson, Gregory King, Quentin Le Godec, Gilles Leung, Arthur Louie, Dan Mammarella, Franco Michels, Olivier Morato, Alessandro Nussbaumer, Rod Pretelli, Miguel Taddia, Giuseppe Valencia, Claudio The New 20 kA 80 V Power Supply for the 520 MeV H$^-$ Cyclotron at TRIUMF |
title | The New 20 kA 80 V Power Supply for the 520 MeV H$^-$ Cyclotron at TRIUMF |
title_full | The New 20 kA 80 V Power Supply for the 520 MeV H$^-$ Cyclotron at TRIUMF |
title_fullStr | The New 20 kA 80 V Power Supply for the 520 MeV H$^-$ Cyclotron at TRIUMF |
title_full_unstemmed | The New 20 kA 80 V Power Supply for the 520 MeV H$^-$ Cyclotron at TRIUMF |
title_short | The New 20 kA 80 V Power Supply for the 520 MeV H$^-$ Cyclotron at TRIUMF |
title_sort | new 20 ka 80 v power supply for the 520 mev h$^-$ cyclotron at triumf |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2018-THPAL062 http://cds.cern.ch/record/2673662 |
work_keys_str_mv | AT carrozzasaverino thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf AT bastosmiguel thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf AT bondesanluca thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf AT burnetjeanpaul thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf AT bylinskiyu thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf AT hudsongregory thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf AT kingquentin thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf AT legodecgilles thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf AT leungarthur thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf AT louiedan thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf AT mammarellafranco thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf AT michelsolivier thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf AT moratoalessandro thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf AT nussbaumerrod thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf AT pretellimiguel thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf AT taddiagiuseppe thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf AT valenciaclaudio thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf AT carrozzasaverino new20ka80vpowersupplyforthe520mevhcyclotronattriumf AT bastosmiguel new20ka80vpowersupplyforthe520mevhcyclotronattriumf AT bondesanluca new20ka80vpowersupplyforthe520mevhcyclotronattriumf AT burnetjeanpaul new20ka80vpowersupplyforthe520mevhcyclotronattriumf AT bylinskiyu new20ka80vpowersupplyforthe520mevhcyclotronattriumf AT hudsongregory new20ka80vpowersupplyforthe520mevhcyclotronattriumf AT kingquentin new20ka80vpowersupplyforthe520mevhcyclotronattriumf AT legodecgilles new20ka80vpowersupplyforthe520mevhcyclotronattriumf AT leungarthur new20ka80vpowersupplyforthe520mevhcyclotronattriumf AT louiedan new20ka80vpowersupplyforthe520mevhcyclotronattriumf AT mammarellafranco new20ka80vpowersupplyforthe520mevhcyclotronattriumf AT michelsolivier new20ka80vpowersupplyforthe520mevhcyclotronattriumf AT moratoalessandro new20ka80vpowersupplyforthe520mevhcyclotronattriumf AT nussbaumerrod new20ka80vpowersupplyforthe520mevhcyclotronattriumf AT pretellimiguel new20ka80vpowersupplyforthe520mevhcyclotronattriumf AT taddiagiuseppe new20ka80vpowersupplyforthe520mevhcyclotronattriumf AT valenciaclaudio new20ka80vpowersupplyforthe520mevhcyclotronattriumf |