The New 20 kA 80 V Power Supply for the 520 MeV H$^-$ Cyclotron at TRIUMF

The new 20 kA, 80 V power supply for the main magnet of the 520 MeV H⁻ Cyclotron at TRIUMF was awarded to OCEM. It has replaced the original system (commissioned in 1976) based on a series pass regulator. The final acceptance tests have demonstrated the com-pliance with the project specifications, e...

Descripción completa

Detalles Bibliográficos
Autores principales: Carrozza, Saverino, Bastos, Miguel, Bondesan, Luca, Burnet, Jean-Paul, Bylinski, Yu, Hudson, Gregory, King, Quentin, Le Godec, Gilles, Leung, Arthur, Louie, Dan, Mammarella, Franco, Michels, Olivier, Morato, Alessandro, Nussbaumer, Rod, Pretelli, Miguel, Taddia, Giuseppe, Valencia, Claudio
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2018-THPAL062
http://cds.cern.ch/record/2673662
_version_ 1780962525112696832
author Carrozza, Saverino
Bastos, Miguel
Bondesan, Luca
Burnet, Jean-Paul
Bylinski, Yu
Hudson, Gregory
King, Quentin
Le Godec, Gilles
Leung, Arthur
Louie, Dan
Mammarella, Franco
Michels, Olivier
Morato, Alessandro
Nussbaumer, Rod
Pretelli, Miguel
Taddia, Giuseppe
Valencia, Claudio
author_facet Carrozza, Saverino
Bastos, Miguel
Bondesan, Luca
Burnet, Jean-Paul
Bylinski, Yu
Hudson, Gregory
King, Quentin
Le Godec, Gilles
Leung, Arthur
Louie, Dan
Mammarella, Franco
Michels, Olivier
Morato, Alessandro
Nussbaumer, Rod
Pretelli, Miguel
Taddia, Giuseppe
Valencia, Claudio
author_sort Carrozza, Saverino
collection CERN
description The new 20 kA, 80 V power supply for the main magnet of the 520 MeV H⁻ Cyclotron at TRIUMF was awarded to OCEM. It has replaced the original system (commissioned in 1976) based on a series pass regulator. The final acceptance tests have demonstrated the com-pliance with the project specifications, especially for the high current stability required for the Cyclotron operation. The current stability is ±5 ppm, including current ripple, for a period of more than 8 hours of continuous operation. In addition, the magnetic field can be further stabilized us-ing feedback of a flux loop signal. OCEM designed the power supply to use the third gen-eration of Function Generator/Controller (FGC3) control electronics from CERN. This was chosen to obtain the high current stability required by TRIUMF. This collaboration was facilitated through a Knowledge Transfer agreement between CERN and OCEM. The power supply commis-sioning has been performed as a collaboration between OCEM, TRIUMF and CERN. This paper describes the topology of the power supply, the control electronics, the high-precision current measure-ment system and the associated software as well as the commissioning results carried out with the magnet.
id oai-inspirehep.net-1689772
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2018
record_format invenio
spelling oai-inspirehep.net-16897722019-09-30T06:29:59Zdoi:10.18429/JACoW-IPAC2018-THPAL062http://cds.cern.ch/record/2673662engCarrozza, SaverinoBastos, MiguelBondesan, LucaBurnet, Jean-PaulBylinski, YuHudson, GregoryKing, QuentinLe Godec, GillesLeung, ArthurLouie, DanMammarella, FrancoMichels, OlivierMorato, AlessandroNussbaumer, RodPretelli, MiguelTaddia, GiuseppeValencia, ClaudioThe New 20 kA 80 V Power Supply for the 520 MeV H$^-$ Cyclotron at TRIUMFAccelerators and Storage RingsThe new 20 kA, 80 V power supply for the main magnet of the 520 MeV H⁻ Cyclotron at TRIUMF was awarded to OCEM. It has replaced the original system (commissioned in 1976) based on a series pass regulator. The final acceptance tests have demonstrated the com-pliance with the project specifications, especially for the high current stability required for the Cyclotron operation. The current stability is ±5 ppm, including current ripple, for a period of more than 8 hours of continuous operation. In addition, the magnetic field can be further stabilized us-ing feedback of a flux loop signal. OCEM designed the power supply to use the third gen-eration of Function Generator/Controller (FGC3) control electronics from CERN. This was chosen to obtain the high current stability required by TRIUMF. This collaboration was facilitated through a Knowledge Transfer agreement between CERN and OCEM. The power supply commis-sioning has been performed as a collaboration between OCEM, TRIUMF and CERN. This paper describes the topology of the power supply, the control electronics, the high-precision current measure-ment system and the associated software as well as the commissioning results carried out with the magnet.oai:inspirehep.net:16897722018
spellingShingle Accelerators and Storage Rings
Carrozza, Saverino
Bastos, Miguel
Bondesan, Luca
Burnet, Jean-Paul
Bylinski, Yu
Hudson, Gregory
King, Quentin
Le Godec, Gilles
Leung, Arthur
Louie, Dan
Mammarella, Franco
Michels, Olivier
Morato, Alessandro
Nussbaumer, Rod
Pretelli, Miguel
Taddia, Giuseppe
Valencia, Claudio
The New 20 kA 80 V Power Supply for the 520 MeV H$^-$ Cyclotron at TRIUMF
title The New 20 kA 80 V Power Supply for the 520 MeV H$^-$ Cyclotron at TRIUMF
title_full The New 20 kA 80 V Power Supply for the 520 MeV H$^-$ Cyclotron at TRIUMF
title_fullStr The New 20 kA 80 V Power Supply for the 520 MeV H$^-$ Cyclotron at TRIUMF
title_full_unstemmed The New 20 kA 80 V Power Supply for the 520 MeV H$^-$ Cyclotron at TRIUMF
title_short The New 20 kA 80 V Power Supply for the 520 MeV H$^-$ Cyclotron at TRIUMF
title_sort new 20 ka 80 v power supply for the 520 mev h$^-$ cyclotron at triumf
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2018-THPAL062
http://cds.cern.ch/record/2673662
work_keys_str_mv AT carrozzasaverino thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT bastosmiguel thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT bondesanluca thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT burnetjeanpaul thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT bylinskiyu thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT hudsongregory thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT kingquentin thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT legodecgilles thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT leungarthur thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT louiedan thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT mammarellafranco thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT michelsolivier thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT moratoalessandro thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT nussbaumerrod thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT pretellimiguel thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT taddiagiuseppe thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT valenciaclaudio thenew20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT carrozzasaverino new20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT bastosmiguel new20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT bondesanluca new20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT burnetjeanpaul new20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT bylinskiyu new20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT hudsongregory new20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT kingquentin new20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT legodecgilles new20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT leungarthur new20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT louiedan new20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT mammarellafranco new20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT michelsolivier new20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT moratoalessandro new20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT nussbaumerrod new20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT pretellimiguel new20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT taddiagiuseppe new20ka80vpowersupplyforthe520mevhcyclotronattriumf
AT valenciaclaudio new20ka80vpowersupplyforthe520mevhcyclotronattriumf