Cargando…
High Power and High Repetition Rate X-band Power Source Using Multiple Klystrons
In July 2016, the first X-band test facility operating with two interwoven, 6 MW klystron pulses was commissioned at CERN. Outputting up to 46 MW after pulse compression, the new test stand allows testing of two structures concurrently with repetition rates up to 400 Hz in each line. RF commissionin...
Autores principales: | Volpi, Matteo, Boland, Mark, Catalán Lasheras, Nuria, Giansiracusa, Paul, Grudiev, Alexej, Lucas, Thomas, McMonagle, Gerard, Paszkiewicz, Jan, Rassool, Roger, Serpico, Claudio, Syratchev, Igor, Vnuchenko, Anna, Woolley, Benjamin, Wuensch, Walter, del Pozo Romano, Veronica |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2018-THPMK104 http://cds.cern.ch/record/2648551 |
Ejemplares similares
-
High Power Conditioning of X-Band RF Components
por: Catalán Lasheras, Nuria, et al.
Publicado: (2018) -
Initial Testing of Techniques for Large Scale Rf Conditioning for the Compact Linear Collider
por: Lucas, Thomas, et al.
Publicado: (2018) -
High Power X-Band Generation Using Multiple Klystrons and Pulse Compression
por: Woolley, Benjamin, et al.
Publicado: (2017) -
Exploration of a klystron-powered first energy stage of CLIC
por: Schulte, Daniel, et al.
Publicado: (2012) -
High power conditioning of X-band variable power splitter and phase shifter
por: del Pozo Romano, Veronica, et al.
Publicado: (2019)