Cargando…
Assembly of the DQW Crab Cavity Cryomodule for SPS Test
RF Crab Cavities are an essential part of the High Luminosity Upgrade of the LHC accelerating complex. Two concepts of such superconducting systems are being developed: the Double Quarter Wave (DQW) and the RF Dipole (RFD). A prototype cryomodule - hosting two DQW cavities - has been fabricated and...
Autores principales: | , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2018-WEPMF078 http://cds.cern.ch/record/2648553 |
Sumario: | RF Crab Cavities are an essential part of the High Luminosity Upgrade of the LHC accelerating complex. Two concepts of such superconducting systems are being developed: the Double Quarter Wave (DQW) and the RF Dipole (RFD). A prototype cryomodule - hosting two DQW cavities - has been fabricated and assembled for validation tests to be carried out in the Super Proton Synchrotron (SPS) at CERN. An overview of the main cryomodule components is presented, together with the system features and main fabrication requirements. The preparatory measures for cryomodule assembly, the execution and lessons learned are also discussed. |
---|