Cargando…

Beam Dump Facility Target: Design Status and Beam Tests in 2018

The Beam Dump Facility (BDF) Project, currently in its design phase, is a proposed general-purpose fixed target facility at CERN, dedicated to the Search for Hidden Particles (SHiP) experiment in its initial phase. At the core of the installation resides the target/dump assembly, whose aim is to ful...

Descripción completa

Detalles Bibliográficos
Autores principales: Lopez Sola, Edmundo, Aberle, Oliver, Avigni, Pietro, Bianchi, Laura, Busom, Josep, Calviani, Marco, Casolino, Mirkoantonio, Espadanal, Joao, Fraser, Matthew, Girod, Sylvain, Goddard, Brennan, Grenier, Damien, Guinchard, Michael, Heßler, Christoph, Illan Fiastre, Ricardo, Jacobsson, Richard, Lamont, Mike, Ortega Rolo, Adrian, Riffaud, Benoit, Romagnoli, Giulia, Zuccalli, Laurent
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2018-WEPMG002
http://cds.cern.ch/record/2647702
_version_ 1780960667669364736
author Lopez Sola, Edmundo
Aberle, Oliver
Avigni, Pietro
Bianchi, Laura
Busom, Josep
Calviani, Marco
Casolino, Mirkoantonio
Espadanal, Joao
Fraser, Matthew
Girod, Sylvain
Goddard, Brennan
Grenier, Damien
Guinchard, Michael
Heßler, Christoph
Illan Fiastre, Ricardo
Jacobsson, Richard
Lamont, Mike
Ortega Rolo, Adrian
Riffaud, Benoit
Romagnoli, Giulia
Zuccalli, Laurent
author_facet Lopez Sola, Edmundo
Aberle, Oliver
Avigni, Pietro
Bianchi, Laura
Busom, Josep
Calviani, Marco
Casolino, Mirkoantonio
Espadanal, Joao
Fraser, Matthew
Girod, Sylvain
Goddard, Brennan
Grenier, Damien
Guinchard, Michael
Heßler, Christoph
Illan Fiastre, Ricardo
Jacobsson, Richard
Lamont, Mike
Ortega Rolo, Adrian
Riffaud, Benoit
Romagnoli, Giulia
Zuccalli, Laurent
author_sort Lopez Sola, Edmundo
collection CERN
description The Beam Dump Facility (BDF) Project, currently in its design phase, is a proposed general-purpose fixed target facility at CERN, dedicated to the Search for Hidden Particles (SHiP) experiment in its initial phase. At the core of the installation resides the target/dump assembly, whose aim is to fully absorb the high intensity 400 GeV/c SPS beam and produce charmed mesons. In addition to high thermo-mechanical loads, the most challenging aspects of the proposed installation lie in very high energy and power density deposition that are reached during operation. In order to validate the design of the BDF target, a scaled prototype is going to be tested during 2018 in the North Area at CERN, upstream the existing beryllium primary targets. The prototype testing under representative beam scenarios will allow having an insight of the material response in an unprecedented regime. Online monitoring and an extensive Post Irradiation Experimental (PIE) campaign are foreseen. The current contribution will detail the design of the BDF target/dump core as well as the design and construction of the prototype target assembly.
id oai-inspirehep.net-1690189
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2018
record_format invenio
spelling oai-inspirehep.net-16901892021-08-31T12:55:50Zdoi:10.18429/JACoW-IPAC2018-WEPMG002http://cds.cern.ch/record/2647702engLopez Sola, EdmundoAberle, OliverAvigni, PietroBianchi, LauraBusom, JosepCalviani, MarcoCasolino, MirkoantonioEspadanal, JoaoFraser, MatthewGirod, SylvainGoddard, BrennanGrenier, DamienGuinchard, MichaelHeßler, ChristophIllan Fiastre, RicardoJacobsson, RichardLamont, MikeOrtega Rolo, AdrianRiffaud, BenoitRomagnoli, GiuliaZuccalli, LaurentBeam Dump Facility Target: Design Status and Beam Tests in 2018Accelerators and Storage RingsThe Beam Dump Facility (BDF) Project, currently in its design phase, is a proposed general-purpose fixed target facility at CERN, dedicated to the Search for Hidden Particles (SHiP) experiment in its initial phase. At the core of the installation resides the target/dump assembly, whose aim is to fully absorb the high intensity 400 GeV/c SPS beam and produce charmed mesons. In addition to high thermo-mechanical loads, the most challenging aspects of the proposed installation lie in very high energy and power density deposition that are reached during operation. In order to validate the design of the BDF target, a scaled prototype is going to be tested during 2018 in the North Area at CERN, upstream the existing beryllium primary targets. The prototype testing under representative beam scenarios will allow having an insight of the material response in an unprecedented regime. Online monitoring and an extensive Post Irradiation Experimental (PIE) campaign are foreseen. The current contribution will detail the design of the BDF target/dump core as well as the design and construction of the prototype target assembly.CERN-ACC-2018-154CERN-PBC-CONF-2021-013oai:inspirehep.net:16901892018
spellingShingle Accelerators and Storage Rings
Lopez Sola, Edmundo
Aberle, Oliver
Avigni, Pietro
Bianchi, Laura
Busom, Josep
Calviani, Marco
Casolino, Mirkoantonio
Espadanal, Joao
Fraser, Matthew
Girod, Sylvain
Goddard, Brennan
Grenier, Damien
Guinchard, Michael
Heßler, Christoph
Illan Fiastre, Ricardo
Jacobsson, Richard
Lamont, Mike
Ortega Rolo, Adrian
Riffaud, Benoit
Romagnoli, Giulia
Zuccalli, Laurent
Beam Dump Facility Target: Design Status and Beam Tests in 2018
title Beam Dump Facility Target: Design Status and Beam Tests in 2018
title_full Beam Dump Facility Target: Design Status and Beam Tests in 2018
title_fullStr Beam Dump Facility Target: Design Status and Beam Tests in 2018
title_full_unstemmed Beam Dump Facility Target: Design Status and Beam Tests in 2018
title_short Beam Dump Facility Target: Design Status and Beam Tests in 2018
title_sort beam dump facility target: design status and beam tests in 2018
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2018-WEPMG002
http://cds.cern.ch/record/2647702
work_keys_str_mv AT lopezsolaedmundo beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT aberleoliver beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT avignipietro beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT bianchilaura beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT busomjosep beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT calvianimarco beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT casolinomirkoantonio beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT espadanaljoao beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT frasermatthew beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT girodsylvain beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT goddardbrennan beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT grenierdamien beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT guinchardmichael beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT heßlerchristoph beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT illanfiastrericardo beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT jacobssonrichard beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT lamontmike beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT ortegaroloadrian beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT riffaudbenoit beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT romagnoligiulia beamdumpfacilitytargetdesignstatusandbeamtestsin2018
AT zuccallilaurent beamdumpfacilitytargetdesignstatusandbeamtestsin2018