Cargando…
Beam Dump Facility Target: Design Status and Beam Tests in 2018
The Beam Dump Facility (BDF) Project, currently in its design phase, is a proposed general-purpose fixed target facility at CERN, dedicated to the Search for Hidden Particles (SHiP) experiment in its initial phase. At the core of the installation resides the target/dump assembly, whose aim is to ful...
Autores principales: | , , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2018-WEPMG002 http://cds.cern.ch/record/2647702 |
_version_ | 1780960667669364736 |
---|---|
author | Lopez Sola, Edmundo Aberle, Oliver Avigni, Pietro Bianchi, Laura Busom, Josep Calviani, Marco Casolino, Mirkoantonio Espadanal, Joao Fraser, Matthew Girod, Sylvain Goddard, Brennan Grenier, Damien Guinchard, Michael Heßler, Christoph Illan Fiastre, Ricardo Jacobsson, Richard Lamont, Mike Ortega Rolo, Adrian Riffaud, Benoit Romagnoli, Giulia Zuccalli, Laurent |
author_facet | Lopez Sola, Edmundo Aberle, Oliver Avigni, Pietro Bianchi, Laura Busom, Josep Calviani, Marco Casolino, Mirkoantonio Espadanal, Joao Fraser, Matthew Girod, Sylvain Goddard, Brennan Grenier, Damien Guinchard, Michael Heßler, Christoph Illan Fiastre, Ricardo Jacobsson, Richard Lamont, Mike Ortega Rolo, Adrian Riffaud, Benoit Romagnoli, Giulia Zuccalli, Laurent |
author_sort | Lopez Sola, Edmundo |
collection | CERN |
description | The Beam Dump Facility (BDF) Project, currently in its design phase, is a proposed general-purpose fixed target facility at CERN, dedicated to the Search for Hidden Particles (SHiP) experiment in its initial phase. At the core of the installation resides the target/dump assembly, whose aim is to fully absorb the high intensity 400 GeV/c SPS beam and produce charmed mesons. In addition to high thermo-mechanical loads, the most challenging aspects of the proposed installation lie in very high energy and power density deposition that are reached during operation. In order to validate the design of the BDF target, a scaled prototype is going to be tested during 2018 in the North Area at CERN, upstream the existing beryllium primary targets. The prototype testing under representative beam scenarios will allow having an insight of the material response in an unprecedented regime. Online monitoring and an extensive Post Irradiation Experimental (PIE) campaign are foreseen. The current contribution will detail the design of the BDF target/dump core as well as the design and construction of the prototype target assembly. |
id | oai-inspirehep.net-1690189 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2018 |
record_format | invenio |
spelling | oai-inspirehep.net-16901892021-08-31T12:55:50Zdoi:10.18429/JACoW-IPAC2018-WEPMG002http://cds.cern.ch/record/2647702engLopez Sola, EdmundoAberle, OliverAvigni, PietroBianchi, LauraBusom, JosepCalviani, MarcoCasolino, MirkoantonioEspadanal, JoaoFraser, MatthewGirod, SylvainGoddard, BrennanGrenier, DamienGuinchard, MichaelHeßler, ChristophIllan Fiastre, RicardoJacobsson, RichardLamont, MikeOrtega Rolo, AdrianRiffaud, BenoitRomagnoli, GiuliaZuccalli, LaurentBeam Dump Facility Target: Design Status and Beam Tests in 2018Accelerators and Storage RingsThe Beam Dump Facility (BDF) Project, currently in its design phase, is a proposed general-purpose fixed target facility at CERN, dedicated to the Search for Hidden Particles (SHiP) experiment in its initial phase. At the core of the installation resides the target/dump assembly, whose aim is to fully absorb the high intensity 400 GeV/c SPS beam and produce charmed mesons. In addition to high thermo-mechanical loads, the most challenging aspects of the proposed installation lie in very high energy and power density deposition that are reached during operation. In order to validate the design of the BDF target, a scaled prototype is going to be tested during 2018 in the North Area at CERN, upstream the existing beryllium primary targets. The prototype testing under representative beam scenarios will allow having an insight of the material response in an unprecedented regime. Online monitoring and an extensive Post Irradiation Experimental (PIE) campaign are foreseen. The current contribution will detail the design of the BDF target/dump core as well as the design and construction of the prototype target assembly.CERN-ACC-2018-154CERN-PBC-CONF-2021-013oai:inspirehep.net:16901892018 |
spellingShingle | Accelerators and Storage Rings Lopez Sola, Edmundo Aberle, Oliver Avigni, Pietro Bianchi, Laura Busom, Josep Calviani, Marco Casolino, Mirkoantonio Espadanal, Joao Fraser, Matthew Girod, Sylvain Goddard, Brennan Grenier, Damien Guinchard, Michael Heßler, Christoph Illan Fiastre, Ricardo Jacobsson, Richard Lamont, Mike Ortega Rolo, Adrian Riffaud, Benoit Romagnoli, Giulia Zuccalli, Laurent Beam Dump Facility Target: Design Status and Beam Tests in 2018 |
title | Beam Dump Facility Target: Design Status and Beam Tests in 2018 |
title_full | Beam Dump Facility Target: Design Status and Beam Tests in 2018 |
title_fullStr | Beam Dump Facility Target: Design Status and Beam Tests in 2018 |
title_full_unstemmed | Beam Dump Facility Target: Design Status and Beam Tests in 2018 |
title_short | Beam Dump Facility Target: Design Status and Beam Tests in 2018 |
title_sort | beam dump facility target: design status and beam tests in 2018 |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2018-WEPMG002 http://cds.cern.ch/record/2647702 |
work_keys_str_mv | AT lopezsolaedmundo beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT aberleoliver beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT avignipietro beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT bianchilaura beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT busomjosep beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT calvianimarco beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT casolinomirkoantonio beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT espadanaljoao beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT frasermatthew beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT girodsylvain beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT goddardbrennan beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT grenierdamien beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT guinchardmichael beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT heßlerchristoph beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT illanfiastrericardo beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT jacobssonrichard beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT lamontmike beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT ortegaroloadrian beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT riffaudbenoit beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT romagnoligiulia beamdumpfacilitytargetdesignstatusandbeamtestsin2018 AT zuccallilaurent beamdumpfacilitytargetdesignstatusandbeamtestsin2018 |