Cargando…

Experimental Setup to Characterize the Radiation Hardness of Cryogenic Bypass Diodes for the HL-LHC Inner Triplet Circuits

For the high luminosity upgrade of the Large Hadron Collider (LHC), it is planned to replace the existing triplet quadrupole magnets with Nb₃Sn quadrupole magnets, which provide a comparable integrated field gradient with a significantly increased aperture. These magnets will be powered through a no...

Descripción completa

Detalles Bibliográficos
Autores principales: Will, Andreas, Bernhard, Axel, D'Angelo, Giorgio, Denz, Reiner, Favre, Mathieu, Hagedorn, Dietrich, Kirby, Glyn, Kistrup, Lucas, Koettig, Torsten, Monteuuis, Arnaud, Mueller, Anke-Susanne, Rodriguez-Mateos, Felix, Siemko, Andrzej, Stachon, Krzysztof, Valette, Matthieu, Verweij, Arjan, Wollmann, Daniel
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2018-WEPMG006
http://cds.cern.ch/record/2672227
Descripción
Sumario:For the high luminosity upgrade of the Large Hadron Collider (LHC), it is planned to replace the existing triplet quadrupole magnets with Nb₃Sn quadrupole magnets, which provide a comparable integrated field gradient with a significantly increased aperture. These magnets will be powered through a novel superconducting link based on MgB₂ cables. One option for the powering layout of this triplet circuit is the use of cryogenic bypass diodes, where the diodes are located inside an extension to the magnet cryostat and operated in superfluid helium. Hence, they are exposed to radiation. For this reason the radiation hardness of existing LHC type bypass diodes and more radiation tolerant prototype diodes needs to be tested up to the radiation doses expected at their planned position during their lifetime. A first irradiation test is planned in CERN's CHARM facility starting in spring 2018. Therefore, a cryo-cooler based cryostat to irradiate and test LHC type diodes in-situ has been designed and constructed. This paper will describe the properties of the sample diodes, the experimental roadmap and the setup installed in CHARM. Finally, the first measurement results will be discussed.