Cargando…

Longitudinal Impedance Analysis of an Upgraded LHC Injection Kicker Magnet

Prior to Long Shutdown 1 (LS1) one of the LHC injection kickers (MKIs) occasionally exhibited high temperatures leading to significant turnaround times. After a successful impedance mitigation campaign during LS1, the MKI ferrite yokes have remained below their Curie point and have not limited LHC&#...

Descripción completa

Detalles Bibliográficos
Autores principales: Vlachodimitropoulos, Vasileios, Barnes, Michael, Vega Cid, Lorena, Weterings, Wim, Ducimetière, L.
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2018-WEPMK002
http://cds.cern.ch/record/2672229
_version_ 1780962531154591744
author Vlachodimitropoulos, Vasileios
Barnes, Michael
Vega Cid, Lorena
Weterings, Wim
Ducimetière, L.
author_facet Vlachodimitropoulos, Vasileios
Barnes, Michael
Vega Cid, Lorena
Weterings, Wim
Ducimetière, L.
author_sort Vlachodimitropoulos, Vasileios
collection CERN
description Prior to Long Shutdown 1 (LS1) one of the LHC injection kickers (MKIs) occasionally exhibited high temperatures leading to significant turnaround times. After a successful impedance mitigation campaign during LS1, the MKI ferrite yokes have remained below their Curie point and have not limited LHC's availability. However, for HL-LHC operation the MKI yokes are expected to exceed their Curie temperatures after long physics runs. To ensure uninterrupted future HL-LHC operation, a modified beam screen design, relocating some of the heat load to more easily cooled parts, and a suitable cooling system are under development as the current baseline for the HL-LHC upgrade of the MKIs. An upgraded beam screen providing such relocation has been designed, simulated and compared to the existing model. To validate simulations, two longitudinal beam coupling impedance measurement techniques have been used and the results are compared to predictions. The modified beam screen was implemented in an upgraded MKI installed in the LHC during the Year End Technical Stop (YETS) 2017/18.
id oai-inspirehep.net-1690195
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2018
record_format invenio
spelling oai-inspirehep.net-16901952019-09-30T06:29:59Zdoi:10.18429/JACoW-IPAC2018-WEPMK002http://cds.cern.ch/record/2672229engVlachodimitropoulos, VasileiosBarnes, MichaelVega Cid, LorenaWeterings, WimDucimetière, L.Longitudinal Impedance Analysis of an Upgraded LHC Injection Kicker MagnetAccelerators and Storage RingsPrior to Long Shutdown 1 (LS1) one of the LHC injection kickers (MKIs) occasionally exhibited high temperatures leading to significant turnaround times. After a successful impedance mitigation campaign during LS1, the MKI ferrite yokes have remained below their Curie point and have not limited LHC's availability. However, for HL-LHC operation the MKI yokes are expected to exceed their Curie temperatures after long physics runs. To ensure uninterrupted future HL-LHC operation, a modified beam screen design, relocating some of the heat load to more easily cooled parts, and a suitable cooling system are under development as the current baseline for the HL-LHC upgrade of the MKIs. An upgraded beam screen providing such relocation has been designed, simulated and compared to the existing model. To validate simulations, two longitudinal beam coupling impedance measurement techniques have been used and the results are compared to predictions. The modified beam screen was implemented in an upgraded MKI installed in the LHC during the Year End Technical Stop (YETS) 2017/18.oai:inspirehep.net:16901952018
spellingShingle Accelerators and Storage Rings
Vlachodimitropoulos, Vasileios
Barnes, Michael
Vega Cid, Lorena
Weterings, Wim
Ducimetière, L.
Longitudinal Impedance Analysis of an Upgraded LHC Injection Kicker Magnet
title Longitudinal Impedance Analysis of an Upgraded LHC Injection Kicker Magnet
title_full Longitudinal Impedance Analysis of an Upgraded LHC Injection Kicker Magnet
title_fullStr Longitudinal Impedance Analysis of an Upgraded LHC Injection Kicker Magnet
title_full_unstemmed Longitudinal Impedance Analysis of an Upgraded LHC Injection Kicker Magnet
title_short Longitudinal Impedance Analysis of an Upgraded LHC Injection Kicker Magnet
title_sort longitudinal impedance analysis of an upgraded lhc injection kicker magnet
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2018-WEPMK002
http://cds.cern.ch/record/2672229
work_keys_str_mv AT vlachodimitropoulosvasileios longitudinalimpedanceanalysisofanupgradedlhcinjectionkickermagnet
AT barnesmichael longitudinalimpedanceanalysisofanupgradedlhcinjectionkickermagnet
AT vegacidlorena longitudinalimpedanceanalysisofanupgradedlhcinjectionkickermagnet
AT weteringswim longitudinalimpedanceanalysisofanupgradedlhcinjectionkickermagnet
AT ducimetierel longitudinalimpedanceanalysisofanupgradedlhcinjectionkickermagnet