Cargando…
Testing of the ESS MB-IOT Prototypes
ESS is considering the use of MB-IOTs for parts of the high-beta linac. Two prototypes have been built by indus-try, namely L3 and CPI/Thales and have passed the factory acceptance test with excellent results. Both tubes will go through further extensive testing at CERN for ESS follow-ing delivery a...
Autores principales: | , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2018-WEXGBF1 http://cds.cern.ch/record/2669211 |
Sumario: | ESS is considering the use of MB-IOTs for parts of the high-beta linac. Two prototypes have been built by indus-try, namely L3 and CPI/Thales and have passed the factory acceptance test with excellent results. Both tubes will go through further extensive testing at CERN for ESS follow-ing delivery and a final decision on tube technology will be taken in April 2018. This invited talk presents the back-ground for the technical decision of IOTs vs klystrons, associated impact for ESS, and latest plans for industrial production of these IOTs for ESS. |
---|