The New CLIC Main Linac Installation and Alignment Strategy
A complete solution has been proposed for the pre-alignment of the CLIC main linac in 2012 for the Conceptual Design Report. Two recent studies provide new perspectives for such a pre-alignment. First in a study on Particle Accelerator Components' Metrology and Alignment to the Nanometre scale...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2018-WEPAF066 http://cds.cern.ch/record/2667532 |
_version_ | 1780962136960270336 |
---|---|
author | Mainaud Durand, Helene Gayde, Jean-Christophe Jaros, Jakub Rude, Vivien Sosin, Mateusz Zemanek, Anna |
author_facet | Mainaud Durand, Helene Gayde, Jean-Christophe Jaros, Jakub Rude, Vivien Sosin, Mateusz Zemanek, Anna |
author_sort | Mainaud Durand, Helene |
collection | CERN |
description | A complete solution has been proposed for the pre-alignment of the CLIC main linac in 2012 for the Conceptual Design Report. Two recent studies provide new perspectives for such a pre-alignment. First in a study on Particle Accelerator Components' Metrology and Alignment to the Nanometre scale (PACMAN), new solutions to fiducialise and align different types of components within a micrometric accuracy on the same support were proposed and validated, using a stretched wire. Secondly, a 5 degree of freedom adjustment platform with plug-in motors showed a very accurate and efficient way to adjust remotely components. By combining the results of both studies, two scenarios of installation and alignment for the CLIC main linac are proposed, providing micrometric and automatized solutions of micrometric assembly, fiducialisation and alignment in metrological labs or in the tunnel. In this paper, the outcome of the two studies are presented; the two scenarios of installation and alignment are then detailed and discussed. |
id | oai-inspirehep.net-1690585 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2018 |
record_format | invenio |
spelling | oai-inspirehep.net-16905852019-09-30T06:29:59Zdoi:10.18429/JACoW-IPAC2018-WEPAF066http://cds.cern.ch/record/2667532engMainaud Durand, HeleneGayde, Jean-ChristopheJaros, JakubRude, VivienSosin, MateuszZemanek, AnnaThe New CLIC Main Linac Installation and Alignment StrategyAccelerators and Storage RingsA complete solution has been proposed for the pre-alignment of the CLIC main linac in 2012 for the Conceptual Design Report. Two recent studies provide new perspectives for such a pre-alignment. First in a study on Particle Accelerator Components' Metrology and Alignment to the Nanometre scale (PACMAN), new solutions to fiducialise and align different types of components within a micrometric accuracy on the same support were proposed and validated, using a stretched wire. Secondly, a 5 degree of freedom adjustment platform with plug-in motors showed a very accurate and efficient way to adjust remotely components. By combining the results of both studies, two scenarios of installation and alignment for the CLIC main linac are proposed, providing micrometric and automatized solutions of micrometric assembly, fiducialisation and alignment in metrological labs or in the tunnel. In this paper, the outcome of the two studies are presented; the two scenarios of installation and alignment are then detailed and discussed.A complete solution was proposed for the pre-alignment of the CLIC main linac in 2012 for the Conceptual Design Report. Two recent studies provide new perspectives for such a pre-alignment. First, in a study on Particle Acceler- ator Components Metrology and Alignment to the Nano- metre scale (PACMAN), new solutions to fiducialise and align different types of components within a micrometric accuracy on the same support were proposed and validated, using a stretched wire. Second, 5 degrees of freedom ad- justment platform with plug-in motors showed a very ac- curate and efficient way of remotely adjusting components. By combining both, we propose a new strategy for the in- stallation and alignment of the CLIC main linac, object of this paper.oai:inspirehep.net:16905852018 |
spellingShingle | Accelerators and Storage Rings Mainaud Durand, Helene Gayde, Jean-Christophe Jaros, Jakub Rude, Vivien Sosin, Mateusz Zemanek, Anna The New CLIC Main Linac Installation and Alignment Strategy |
title | The New CLIC Main Linac Installation and Alignment Strategy |
title_full | The New CLIC Main Linac Installation and Alignment Strategy |
title_fullStr | The New CLIC Main Linac Installation and Alignment Strategy |
title_full_unstemmed | The New CLIC Main Linac Installation and Alignment Strategy |
title_short | The New CLIC Main Linac Installation and Alignment Strategy |
title_sort | new clic main linac installation and alignment strategy |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2018-WEPAF066 http://cds.cern.ch/record/2667532 |
work_keys_str_mv | AT mainauddurandhelene thenewclicmainlinacinstallationandalignmentstrategy AT gaydejeanchristophe thenewclicmainlinacinstallationandalignmentstrategy AT jarosjakub thenewclicmainlinacinstallationandalignmentstrategy AT rudevivien thenewclicmainlinacinstallationandalignmentstrategy AT sosinmateusz thenewclicmainlinacinstallationandalignmentstrategy AT zemanekanna thenewclicmainlinacinstallationandalignmentstrategy AT mainauddurandhelene newclicmainlinacinstallationandalignmentstrategy AT gaydejeanchristophe newclicmainlinacinstallationandalignmentstrategy AT jarosjakub newclicmainlinacinstallationandalignmentstrategy AT rudevivien newclicmainlinacinstallationandalignmentstrategy AT sosinmateusz newclicmainlinacinstallationandalignmentstrategy AT zemanekanna newclicmainlinacinstallationandalignmentstrategy |