Cargando…

Commissioning of Beam Instrumentation at the CERN AWAKE Facility After Integration of the Electron Beam Line

The Advanced Proton Driven Plasma Wakefield Acceleration Experiment (AWAKE) is a project at CERN aiming to accelerate an electron bunch in a plasma wakefield driven by a proton bunch*. The plasma is induced in a 10 m long Rubidium vapour cell using a pulsed Ti:Sapphire laser, with the wakefield form...

Descripción completa

Detalles Bibliográficos
Autores principales: Gorgisyan, Ishkhan, Bracco, Chiara, Burger, Stephane, Cascella, Michele, Döbert, Steffen, Gessner, Spencer, Gschwendtner, Edda, Jensen, Lars, Jensen, Steen, Jolly, Simon, Keeble, Fearghus, Mazzoni, Stefano, Medina, David, Pepitone, Kevin, Søby, Lars, Velotti, Francesco, Verzilov, Victor, Wendt, Manfred, Wing, Matthew
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2018-WEPAF070
https://dx.doi.org/10.1088/1742-6596/1067/7/072015
http://cds.cern.ch/record/2649943
_version_ 1780960870480740352
author Gorgisyan, Ishkhan
Bracco, Chiara
Burger, Stephane
Cascella, Michele
Döbert, Steffen
Gessner, Spencer
Gschwendtner, Edda
Jensen, Lars
Jensen, Steen
Jolly, Simon
Keeble, Fearghus
Mazzoni, Stefano
Medina, David
Pepitone, Kevin
Søby, Lars
Velotti, Francesco
Verzilov, Victor
Wendt, Manfred
Wing, Matthew
author_facet Gorgisyan, Ishkhan
Bracco, Chiara
Burger, Stephane
Cascella, Michele
Döbert, Steffen
Gessner, Spencer
Gschwendtner, Edda
Jensen, Lars
Jensen, Steen
Jolly, Simon
Keeble, Fearghus
Mazzoni, Stefano
Medina, David
Pepitone, Kevin
Søby, Lars
Velotti, Francesco
Verzilov, Victor
Wendt, Manfred
Wing, Matthew
author_sort Gorgisyan, Ishkhan
collection CERN
description The Advanced Proton Driven Plasma Wakefield Acceleration Experiment (AWAKE) is a project at CERN aiming to accelerate an electron bunch in a plasma wakefield driven by a proton bunch*. The plasma is induced in a 10 m long Rubidium vapour cell using a pulsed Ti:Sapphire laser, with the wakefield formed by a proton bunch from the CERN SPS. A 16 MeV electron bunch is simultaneously injected into the plasma cell to be accelerated by the wakefield to energies in GeV range over this short distance. After successful runs with the proton and laser beams, the electron beam line was installed and commissioned at the end of 2017 to produce and inject a suitable electron bunch into the plasma cell. To achieve the goals of the experiment, it is important to have reliable beam instrumentation measuring the various parameters of the proton, electron and laser beams such as transverse position, transverse profile as well as temporal synchronization. This contribution presents the status of the beam instrumentation in AWAKE, including the new instruments incorporated into the system for measurements with the electron beam line, and reports on the performance achieved during the AWAKE runs in 2017.
id oai-inspirehep.net-1690589
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2018
record_format invenio
spelling oai-inspirehep.net-16905892021-02-09T10:07:39Zdoi:10.18429/JACoW-IPAC2018-WEPAF070doi:10.1088/1742-6596/1067/7/072015http://cds.cern.ch/record/2649943engGorgisyan, IshkhanBracco, ChiaraBurger, StephaneCascella, MicheleDöbert, SteffenGessner, SpencerGschwendtner, EddaJensen, LarsJensen, SteenJolly, SimonKeeble, FearghusMazzoni, StefanoMedina, DavidPepitone, KevinSøby, LarsVelotti, FrancescoVerzilov, VictorWendt, ManfredWing, MatthewCommissioning of Beam Instrumentation at the CERN AWAKE Facility After Integration of the Electron Beam LineAccelerators and Storage RingsThe Advanced Proton Driven Plasma Wakefield Acceleration Experiment (AWAKE) is a project at CERN aiming to accelerate an electron bunch in a plasma wakefield driven by a proton bunch*. The plasma is induced in a 10 m long Rubidium vapour cell using a pulsed Ti:Sapphire laser, with the wakefield formed by a proton bunch from the CERN SPS. A 16 MeV electron bunch is simultaneously injected into the plasma cell to be accelerated by the wakefield to energies in GeV range over this short distance. After successful runs with the proton and laser beams, the electron beam line was installed and commissioned at the end of 2017 to produce and inject a suitable electron bunch into the plasma cell. To achieve the goals of the experiment, it is important to have reliable beam instrumentation measuring the various parameters of the proton, electron and laser beams such as transverse position, transverse profile as well as temporal synchronization. This contribution presents the status of the beam instrumentation in AWAKE, including the new instruments incorporated into the system for measurements with the electron beam line, and reports on the performance achieved during the AWAKE runs in 2017.The Advanced Proton Driven Plasma Wakefield Acceleration Experiment (AWAKE) is a project at CERN aiming to accelerate an electron bunch in a plasma wakefield driven by a proton bunch. The plasma is induced in a 10 m long rubidium vapor cell using a pulsed Ti:Sapphire laser, with the wakefield formed by a proton bunch from the CERN Super Proton Synchrotron (SPS). A 16 MeV electron bunch is simultaneously injected into the plasma cell to be accelerated by the wakefield to energies in the GeV range over this short distance. After successful runs with the proton and laser beams, the electron beam line was installed and commissioned at the end of 2017 to produce and inject a suitable electron bunch into the plasma cell. To achieve the goals of the experiment, it is important to have reliable beam instrumentation measuring the various parameters of the proton, electron and laser beams. This contribution presents the status of the beam instrumentation in AWAKE and reports on the performance achieved during the AWAKE runs in 2017.CERN-ACC-2018-109oai:inspirehep.net:16905892018
spellingShingle Accelerators and Storage Rings
Gorgisyan, Ishkhan
Bracco, Chiara
Burger, Stephane
Cascella, Michele
Döbert, Steffen
Gessner, Spencer
Gschwendtner, Edda
Jensen, Lars
Jensen, Steen
Jolly, Simon
Keeble, Fearghus
Mazzoni, Stefano
Medina, David
Pepitone, Kevin
Søby, Lars
Velotti, Francesco
Verzilov, Victor
Wendt, Manfred
Wing, Matthew
Commissioning of Beam Instrumentation at the CERN AWAKE Facility After Integration of the Electron Beam Line
title Commissioning of Beam Instrumentation at the CERN AWAKE Facility After Integration of the Electron Beam Line
title_full Commissioning of Beam Instrumentation at the CERN AWAKE Facility After Integration of the Electron Beam Line
title_fullStr Commissioning of Beam Instrumentation at the CERN AWAKE Facility After Integration of the Electron Beam Line
title_full_unstemmed Commissioning of Beam Instrumentation at the CERN AWAKE Facility After Integration of the Electron Beam Line
title_short Commissioning of Beam Instrumentation at the CERN AWAKE Facility After Integration of the Electron Beam Line
title_sort commissioning of beam instrumentation at the cern awake facility after integration of the electron beam line
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2018-WEPAF070
https://dx.doi.org/10.1088/1742-6596/1067/7/072015
http://cds.cern.ch/record/2649943
work_keys_str_mv AT gorgisyanishkhan commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline
AT braccochiara commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline
AT burgerstephane commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline
AT cascellamichele commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline
AT dobertsteffen commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline
AT gessnerspencer commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline
AT gschwendtneredda commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline
AT jensenlars commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline
AT jensensteen commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline
AT jollysimon commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline
AT keeblefearghus commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline
AT mazzonistefano commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline
AT medinadavid commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline
AT pepitonekevin commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline
AT søbylars commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline
AT velottifrancesco commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline
AT verzilovvictor commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline
AT wendtmanfred commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline
AT wingmatthew commissioningofbeaminstrumentationatthecernawakefacilityafterintegrationoftheelectronbeamline