Cargando…

Performance Evaluation of Linac4 During the Reliability Run

Linac4 will replace Linac2 as the first element in the CERN proton injector chain from 2020 onwards, following the second LHC long shutdown (LS2). With more than three times higher energy and number of compo-nents than Linac2, beam availability is one of the main challenges of Linac4. Intended as a...

Descripción completa

Detalles Bibliográficos
Autores principales: Rey Orozko, Odei, Apollonio, Andrea, Erhard, Silvia, Guidoboni, Greta, Mikulec, Bettina, Uythoven, Jan
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2018-WEPAF077
http://cds.cern.ch/record/2667538
Descripción
Sumario:Linac4 will replace Linac2 as the first element in the CERN proton injector chain from 2020 onwards, following the second LHC long shutdown (LS2). With more than three times higher energy and number of compo-nents than Linac2, beam availability is one of the main challenges of Linac4. Intended as a smooth transition from commissioning to operation, a Linac4 Reliability Run was started in July 2017 and is foreseen to last until mid-May 2018. The goal is to achieve the target availability of 95 %. This implies consolidated routine operation and identification of recurring problems. This paper introduces the schedule and operational aspects of the Linac4 Reliability Run, including the developed tools and methods for availability tracking. The paper also summarizes the lessons learned during the first period of the Linac4 Reliability Run with respect to fault tracking and provides an in-depth analysis of the failure modes and observed availability.